Santiago data center market

Power availability in Santiago: DCPI verdict CAUTION, composite score 44.8 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 226 words · generated 2026-11-11 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score44.8/100
MW, all listings18sum of the sites that report MW; most do notany status, unverified listings included
VerdictCAUTION

Santiago at a glance

Santiago has 18 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Ascenty (18 MW).

Capacity by status, as of 2026-11-12
StatusMW
Operational18
Total listed18

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Santiago

DC Hub does not hold a lease-rate figure for this market yet.

Reporting on deployed capacity remains sparse—only one tracked operator discloses megawatt figures—making granular capacity assessment difficult.

The DCPI verdict of CAUTION reflects competing signals in Santiago's power environment. New power procurement will require navigation of Chile's approval processes and grid interconnection timelines; neither score suggests immediate scarcity, but neither confirms unencumbered access to incremental supply.

Santiago's operator roster remains stable, with no recorded transactions, acquisitions, or capital deployments among tracked facilities. This absence of recorded deal flow does not reflect market weakness; it indicates a consolidation phase or private deployment pattern not yet surfaced in public M&A channels.

Power procurement risk in Santiago hinges on grid interconnection capacity and regulatory timelines rather than on operator demand or facility availability.

Data centers in Santiago

FacilityOperatorStatusMW
Ascenty Santiago 1AscentyOperational18
Adexus Santiago - CLink ExtensionAdexus S.A.Operational
Azure Chile Central SantiagoMicrosoftOperational
COLO 2MicrosoftOperational
DC PorvenirIngeniería e Informática Asociada Ltda (IIA Ltda)Operational
GTD data center - PanamericanaGTDOperational
Google Cloud southamerica-west1 SantiagoGoogleOperational
IBM data center / Centro Tecnológico San BernardoOperational
Odata Data CenterOperational
Oracle Cloud Chile SantiagoOracleOperational
SONDA - KudosSONDA S.A.Operational
SONDA - TeatinosSONDA S.A.Operational
entel - Data Center AmunateguiEntel Chile S.A.Operational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Chile.

More on Santiago

Email me when the Santiago DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Santiago: 18 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/santiago/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-11, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load