Power availability in Santiago: DCPI verdict CAUTION, composite score 44.8 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 226 words · generated 2026-11-11 from live DC Hub data · DCPI live as of 2026-11-12
Santiago has 18 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Ascenty (18 MW).
| Status | MW |
|---|---|
| Operational | 18 |
| Total listed | 18 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
Reporting on deployed capacity remains sparse—only one tracked operator discloses megawatt figures—making granular capacity assessment difficult.
The DCPI verdict of CAUTION reflects competing signals in Santiago's power environment. New power procurement will require navigation of Chile's approval processes and grid interconnection timelines; neither score suggests immediate scarcity, but neither confirms unencumbered access to incremental supply.
Santiago's operator roster remains stable, with no recorded transactions, acquisitions, or capital deployments among tracked facilities. This absence of recorded deal flow does not reflect market weakness; it indicates a consolidation phase or private deployment pattern not yet surfaced in public M&A channels.
Power procurement risk in Santiago hinges on grid interconnection capacity and regulatory timelines rather than on operator demand or facility availability.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Ascenty Santiago 1 | Ascenty | Operational | 18 |
| Adexus Santiago - CLink Extension | Adexus S.A. | Operational | |
| Azure Chile Central Santiago | Microsoft | Operational | |
| COLO 2 | Microsoft | Operational | |
| DC Porvenir | Ingeniería e Informática Asociada Ltda (IIA Ltda) | Operational | |
| GTD data center - Panamericana | GTD | Operational | |
| Google Cloud southamerica-west1 Santiago | Operational | ||
| IBM data center / Centro Tecnológico San Bernardo | Operational | ||
| Odata Data Center | Operational | ||
| Oracle Cloud Chile Santiago | Oracle | Operational | |
| SONDA - Kudos | SONDA S.A. | Operational | |
| SONDA - Teatinos | SONDA S.A. | Operational | |
| entel - Data Center Amunategui | Entel Chile S.A. | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Chile.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Santiago: 18 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/santiago/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-11, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load