San Jose data center market

Power availability in San Jose: DCPI verdict CAUTION, composite score 47.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 296 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score47.7/100
MW, all listings549sum of the sites that report MW; most do notany status, unverified listings included
VerdictCAUTION

San Jose at a glance

San Jose has 370 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Equinix (174 MW), Stack Infrastructure (85 MW) and CyrusOne (60 MW).

Capacity by status, as of 2026-11-12
StatusMW
Operational370
Total listed370

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in San Jose

DC Hub does not hold a lease-rate figure for this market yet.

No recent deal activity is tracked in the San Jose market.

The combination means new power can reach San Jose, but not without navigation of supply-side obstacles.

Recent deal flow has stalled entirely. No M&A, expansion announcements, or capacity additions are tracked for San Jose in the current observation window. By contrast, the broader Bay Area ecosystem has seen significant acquisition activity at other operators—particularly in Aligned Data Centers, which closed multiple transactions—but none of those moves are recorded as San Jose–based. Equinix's established presence (eight facilities) and CoreSite's portfolio (four sites) continue to define operator structure, while newer entrants like Stack (three sites) and Oracle (two sites) occupy secondary positions. The absence of deal flow does not characterize operator appetite or market viability; it reflects the current state of announced transactions in this geography.

The San Jose market will face pressure to clarify power pathways if new capacity requests materialize at materially larger scale than current tracked facilities.

Data centers in San Jose

FacilityOperatorStatusMW
Equinix SV CampusEquinixOperational120
Stack Silicon ValleyStack InfrastructureOperational85
CyrusOne San JoseCyrusOneOperational60
Infomart San JoseInfomartOperational40
Equinix SV10EquinixOperational18
Equinix SV11EquinixOperational18
Equinix SV5EquinixOperational18
NTT LimitedOperational11
190 Park Center Plaza San JoseTelePacific CommunicationsOperational
AWS US West 1 (N California)Amazon Web ServicesOperational
CoreSite - San Jose (SV1)CoreSiteOperational
Dell 350 Holger WayOperational
Equinix SV1 San JoseEquinixOperational
Equinix SV1/SV5/SV10 - Silicon Valley, San JoseEquinixOperational
Equinix SV3 - Silicon Valley, San JoseEquinixOperational
Oracle Cloud San Jose (us-sanjose-1)OracleOperational
Oracle Cloud US West San JoseOracleOperational
San Jose Colocation CenterCoreSiteOperational
Stack Infrastructure Silicon Valley SVY01Stack InfrastructureOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in California.

More on San Jose

Email me when the San Jose DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

San Jose: 549 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/san-jose/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load