San Antonio data center market

Power availability in San Antonio: DCPI verdict CAUTION, composite score 42.3 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 256 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score42.3/100
MW, all listings1,747sum of the sites that report MW; most do notany status, unverified listings included
VerdictCAUTION

San Antonio at a glance

San Antonio has 847 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Microsoft (650 MW), H5 Data Centers (75 MW) and CyrusOne (57 MW).

Capacity by status, as of 2026-11-12
StatusMW
Operational847
Total listed847

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in San Antonio

Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: CBRE North America Data Center Trends H1 2026 (250+ kW): Austin-San Antonio (combined market) (figure on paid plans) (link)

The market has drawn regulatory attention: city officials have adopted stricter approval processes for new data center development, and Texas Research Park has emerged as a focal point for regional deployment.

This pairing means operators pursuing incremental capacity will encounter elevated friction in securing grid access and managing interconnection timelines; it does not preclude new builds, but it narrows the margin for oversized power bids or aggressive multi-site expansion plans without prior offtake certainty.

No recent deals are currently tracked in San Antonio, leaving operator consolidation and capacity transfers opaque.

Regulatory scrutiny and the CAUTION verdict together suggest San Antonio's next phase will hinge on grid infrastructure upgrades and interconnection queue management rather than land or operator availability. Watch for announcements of transmission or substation investments tied to specific facility phases.

Data centers in San Antonio

FacilityOperatorStatusMW
Microsoft San Antonio Data CenterMicrosoftOperational350
Microsoft Azure South Central US (Texas)MicrosoftOperational300
MicrosoftOperational50
H5 San Antonio 2H5 Data CentersOperational45
H5 San Antonio 1H5 Data CentersOperational30
CyrusOne San Antonio ICyrusOneOperational19
CyrusOne San Antonio IICyrusOneOperational19
CyrusOne San Antonio IIICyrusOneOperational19
CHRISTUS HealthOperational5
Frost BankOperational5
Lowe's Data CenterLowe'sOperational5
Amazon AWS SAT - 12807 DonopAmazon Web ServicesOperational
Azure South Central US TexasMicrosoftOperational
CyrusOne SAT10 & SAT11CyrusOneOperational
H5 Data Centers San AntonioH5 Data CentersOperational
Lumen San Antonio 1Lumen TechnologiesOperational
Lumen San Antonio 2Lumen TechnologiesOperational
Microsoft SAT 80MicrosoftOperational
Microsoft SAT 81MicrosoftOperational
Microsoft SAT 82MicrosoftOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Texas.

More on San Antonio

Email me when the San Antonio DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

San Antonio: 1,747 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/san-antonio/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load