Power availability in Sacramento: DCPI verdict BUILD, composite score 66.4 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 276 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12
Sacramento has 71 MW operational and 100 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Compass Datacenters (100 MW), Prime Data Centers (60 MW) and NTT (11 MW).
| Status | MW |
|---|---|
| Operational | 71 |
| Under construction | 100 |
| Total listed | 171 |
| Operator | Under construction MW | Planned MW |
|---|---|---|
| Compass Datacenters | 100 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: DC Hub estimate. Below Silicon Valley (CBRE North America Data Center Trends H1 2026 (250+ kW): (figure on paid plans)), above CBRE secondary markets (figure on paid plans) given CA industrial power ~20.6 c/kWh (EIA via DC Hub).
NTT, Prime, and RagingWire Data Centers each operate three to four sites, while Frontier Sacramento and QTS Realty maintain dual presences. The market has not recorded recent deal activity in tracked datasets.
This configuration signals that new power procurement pathways remain available and grid access barriers remain moderate. The BUILD verdict applies specifically to scenarios where new power supply can be secured; it is not a broader market endorsement.
Operator concentration remains moderate, with no single player controlling more than four sites. The absence of recent deal announcements does not indicate demand weakness—it reflects a pause in transaction recording rather than activity cessation. Local media coverage signals active municipal engagement on future projects, including transparency commitments from Sacramento leaders and reports of prospective "large load" facilities under consideration. These signals suggest planning and feasibility discussions are active, even where formal deal announcements have not yet surfaced.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Compass Elk Grove Campus (Sacramento) | Compass Datacenters | Under Construction | 100 |
| Prime Sacramento | Prime Data Centers | Operational | 60 |
| RagingWire CA3 | NTT | Operational | 11 |
| NTT GLOBAL DATA CENTERS | |||
| QTS Sacramento (SAC1) | QTS | Operational | |
| QTS Sacramento CA DC | QTS Realty | Operational | |
| RagingWire CA1 | NTT | Operational | |
| RagingWire CA1 - NTT | RagingWire Data Centers | Operational | |
| RagingWire CA2 | NTT | Operational | |
| RagingWire CA2 - NTT | RagingWire Data Centers | Operational | |
| RagingWire CA3 - NTT | RagingWire Data Centers | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in California.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Sacramento: 336 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/sacramento/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load