Power availability in Reston: DCPI verdict AVOID, composite score 21.2 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 192 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12
Reston has 74 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are CoreSite (60 MW) and Digital Realty (14 MW).
| Status | MW |
|---|---|
| Operational | 74 |
| Total listed | 74 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
The market remains fragmented by operator, with no single player controlling more than a third of tracked capacity. Recent community noise and light pollution complaints documented by local media underscore ongoing friction between operational density and residential proximity in this Northern Virginia corridor.
Together, these scores indicate that sourcing new power commitments will face grid access friction and likely elevated procurement costs relative to unconstrained markets.
Deal flow in Reston has gone silent—no recent transactions are tracked.
| Facility | Operator | Status | MW |
|---|---|---|---|
| CoreSite VA Campus | CoreSite | Operational | 60 |
| VA3 | Digital Realty | Operational | 14 |
| CoreSite - Reston (VA1) | CoreSite | Operational | |
| CoreSite - Reston (VA2) | CoreSite | Operational | |
| CoreSite - Reston (VA3) | CoreSite | Operational | |
| Digital Realty IAD (1780 Business Center) | Digital Realty | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Virginia.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Reston: 129 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/reston/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load