Quincy data center market

Power availability in Quincy: DCPI verdict CAUTION, composite score 44.6 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 327 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score44.6/100
MW, all listings1,347sum of the sites that report MW; most do notany status, unverified listings included
VerdictCAUTION

Quincy at a glance

Quincy has 1,187 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Microsoft (800 MW), Sabey (160 MW) and Prime Data Centers (80 MW).

Capacity by status, as of 2026-11-12
StatusMW
Operational1,187
Total listed1,187

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Quincy

Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: CBRE North America Data Center Trends H1 2026 (250+ kW): Central Washington (figure on paid plans) (link)

No recent deals have been tracked in this market.

Operators seeking to expand capacity or newcomers evaluating entry should expect moderately extended lead times and potentially elevated acquisition costs for incremental megawatts. This combination means power is neither abundantly available nor critically scarce; it sits in a middle band where securing new supply requires active engagement with local utilities and grid operators but remains feasible.

Deal silence in Quincy contrasts with broader market activity elsewhere. Vantage's seven-site presence and Microsoft's six-site footprint indicate both scale and ongoing commitment, yet neither operator has announced new capacity additions lately. H5 Data Centers' three sites represent a smaller but established stake.

Data centers in Quincy

FacilityOperatorStatusMW
Microsoft Azure West US (Washington)MicrosoftOperational400
Microsoft Quincy Data CenterMicrosoftOperational400
Sabey QuincySabeyOperational100
Prime QuincyPrime Data CentersOperational80
Sabey Intergate.ColumbiaSabeyOperational60
MicrosoftOperational50
Vantage QuincyVantage Data CentersOperational50
H5 Quincy 1H5 Data CentersOperational36
NTT Data QuincyNTTOperational11
Azure West US WashingtonMicrosoftOperational
CyrusOne QuincyCyrusOneOperational
H5 Data Centers Quincy 2/3H5 Data CentersOperational
Microsoft MWH Data CenterMicrosoftOperational
Vantage Quincy WAVantage Data CentersOperational
Yahoo Data CenterYahooOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Washington.

More on Quincy

Email me when the Quincy DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Quincy: 1,347 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/quincy/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load