Power availability in Quincy: DCPI verdict CAUTION, composite score 44.6 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 327 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12
Quincy has 1,187 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Microsoft (800 MW), Sabey (160 MW) and Prime Data Centers (80 MW).
| Status | MW |
|---|---|
| Operational | 1,187 |
| Total listed | 1,187 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: CBRE North America Data Center Trends H1 2026 (250+ kW): Central Washington (figure on paid plans) (link)
No recent deals have been tracked in this market.
Operators seeking to expand capacity or newcomers evaluating entry should expect moderately extended lead times and potentially elevated acquisition costs for incremental megawatts. This combination means power is neither abundantly available nor critically scarce; it sits in a middle band where securing new supply requires active engagement with local utilities and grid operators but remains feasible.
Deal silence in Quincy contrasts with broader market activity elsewhere. Vantage's seven-site presence and Microsoft's six-site footprint indicate both scale and ongoing commitment, yet neither operator has announced new capacity additions lately. H5 Data Centers' three sites represent a smaller but established stake.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Microsoft Azure West US (Washington) | Microsoft | Operational | 400 |
| Microsoft Quincy Data Center | Microsoft | Operational | 400 |
| Sabey Quincy | Sabey | Operational | 100 |
| Prime Quincy | Prime Data Centers | Operational | 80 |
| Sabey Intergate.Columbia | Sabey | Operational | 60 |
| Microsoft | Operational | 50 | |
| Vantage Quincy | Vantage Data Centers | Operational | 50 |
| H5 Quincy 1 | H5 Data Centers | Operational | 36 |
| NTT Data Quincy | NTT | Operational | 11 |
| Azure West US Washington | Microsoft | Operational | |
| CyrusOne Quincy | CyrusOne | Operational | |
| H5 Data Centers Quincy 2/3 | H5 Data Centers | Operational | |
| Microsoft MWH Data Center | Microsoft | Operational | |
| Vantage Quincy WA | Vantage Data Centers | Operational | |
| Yahoo Data Center | Yahoo | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Washington.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Quincy: 1,347 MW tracked, any status — live, cited, and queryable by API or MCP.