Portland, ME data center market

Power availability in Portland, ME: DCPI verdict AVOID, composite score 32.3 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 278 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score32.3/100
MW, all listings283sum of the sites that report MW; most do notany status, unverified listings included
VerdictAVOID

Portland, ME at a glance

Portland, ME has 10 MW planned among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Nautilus Data Technologies (10 MW).

Capacity by status, as of 2026-11-12
StatusMW
Planned10
Total listed10

Developers building or planning in Portland, ME

OperatorUnder construction MWPlanned MW
Nautilus Data Technologies10

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Portland, ME

DC Hub does not hold a lease-rate figure for this market yet.

Portland's data center footprint consists of six tracked facilities operated by a mix of regional and national players, with CENTRA Digital Interconnect running two sites and Consolidated Communications, FirstLight, NNENIX, and Nautilus Data Technologies each operating one. The market has attracted modest consolidation interest—regulatory attention in nearby municipalities signals growing awareness of data center deployment—but no recent transactions have been recorded in Portland proper over the tracked window.

These paired signals suggest that operators seeking to expand or new entrants planning greenfield builds should expect deliberate timelines and elevated coordination requirements with local utilities and grid operators. The combination does not foreclose deployment—it means power availability and interconnection speed are the binding variables, not demand.

Operator fragmentation remains pronounced, with no dominant player and no tracked recent deals in the market. Nearby regulatory moves—South Berwick's data center moratorium and Portland, Oregon's emerging transparency rules around data center transactions—reflect broader municipal scrutiny across the region, though these actions do not directly constrain Portland, ME's current permit or interconnection environment.

Forward momentum depends on utility-side capacity additions and interconnection queue visibility, neither of which has generated public announcements in the immediate term.

Data centers in Portland, ME

FacilityOperatorStatusMW
Nautilus MaineNautilus Data TechnologiesPlanned10
CENTRA PWM1 - Portland, Maine (340 Cumberland)CENTRA Digital InterconnectOperational
Consolidated - 45 Forest Ave.Consolidated Communications, Inc.Operational
FirstLight Data CenterFirstLightOperational
FirstLight Regen HutNNENIXOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Maine.

More on Portland, ME

Email me when the Portland, ME DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Portland, ME: 283 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →