Papillion data center market

Power availability in Papillion: DCPI verdict BUILD, composite score 67.9 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 210 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score67.9/100
MW, all listings100sum of the sites that report MW; most do notany status, unverified listings included
VerdictBUILD

PAPILLION at a glance

PAPILLION has 100 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Google (100 MW).

Capacity by status, as of 2026-11-12
StatusMW
Under construction100
Total listed100

Developers building or planning in PAPILLION

OperatorUnder construction MWPlanned MW
Google100

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in PAPILLION

DC Hub does not hold a lease-rate figure for this market yet.

Papillion operates with meaningful power availability relative to current demand. Twelve tracked facilities are live in the market, though only one operator publicly discloses megawatt capacity; operators include Fireball Group LLC Data Center, Google, LightEdge Data Center, LightEdge Solutions, and Midlands Data Center, each maintaining single-site presence in the tracked base.

The DCPI verdict signals that new power procurement is feasible here. Together, these metrics suggest that operators and builders can source additional power without competing against severe scarcity conditions or absorbing prohibitive grid access costs.

No recent deals have been tracked in Papillion, so current deal flow remains opaque. The absence of announced transactions does not signal weak fundamentals or operator reluctance; rather, it reflects the typical market condition where deal announcements cluster unpredictably and depend on announcement cadence and disclosure thresholds. With five distinct operators already active—none dominant—the market shows baseline fragmentation typical of mid-tier data center regions.

Data centers in PAPILLION

FacilityOperatorStatusMW
Google Papillion Building 2GoogleUnder Construction100
FIREBALL GROUP LLC DATA CENTER
LIGHTEDGE DATA CENTER
LightEdge Omaha (OMA1)LightEdge SolutionsOperational
MIDLANDS DATA CENTER
PAPILLION 5 MW DATA CENTER
TierPoint Omaha - MidlandsTierPoint, LLCOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Nebraska.

More on PAPILLION

Email me when the PAPILLION DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

PAPILLION: 100 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/papillion/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load