Ottawa data center market

Power availability in Ottawa: DCPI verdict AVOID, composite score 24.3 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 205 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score24.3/100
MW, all listings0any status, unverified listings included
VerdictAVOID

Colocation lease rates in Ottawa

DC Hub does not hold a lease-rate figure for this market yet.

Ottawa's colocation market consists of eight tracked facilities across four operators, with PureColo Inc. holding the largest footprint at four sites. The market has registered no recent deal activity in the tracked period. Operator concentration is moderate: PureColo and DNSnetworks together control six of eight facilities, while Equinix and Qu Datacentres each operate single sites.

The DCPI verdict of AVOID for new power reflects conflicting supply signals. Together, these scores suggest that new entrants seeking incremental grid access will face elevated negotiation complexity and limited headroom for expansion without grid upgrades. The combination rules out straightforward power-on scenarios but does not indicate grid failure or widespread outages.

Deal flow remains dormant in Ottawa itself, though regional activity has accelerated. Ontario's government unveiled a data center framework in 2026 and issued an Advanced Procurement Notice for a new facility estimated at CA$1.5–1.85 billion. These transactions reflect consolidation at the service and platform level rather than capacity expansion in Ottawa.

Data centers in Ottawa

FacilityOperatorStatusMW
DNSnetworks IDC1DNSnetworks CorporationOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Canada.

More on Ottawa

Email me when the Ottawa DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Ottawa market data is live in DC Hub — cited and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/ottawa/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load