Power availability in Osaka: DCPI verdict AVOID, composite score 18.7 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 282 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12
Osaka has 130 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are AirTrunk (100 MW) and STACK Infrastructure (30 MW).
| Status | MW |
|---|---|
| Under construction | 130 |
| Total listed | 130 |
| Operator | Under construction MW | Planned MW |
|---|---|---|
| AirTrunk | 100 | |
| STACK Infrastructure | 30 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
Digital Realty is constructing the 24 MW KIX15 facility in Osaka, underscoring continued deployment despite these conditions.
The DCPI verdict of AVOID reflects a supply-demand imbalance on the power side. Together, these metrics indicate that acquiring or building incremental capacity requires negotiating power supply agreements in a market where available grid headroom is limited. No recent tracked deals have materialized in Osaka, suggesting current commercial terms may not align with deployment urgency.
OPTAGE's five-site presence establishes the largest operational footprint, followed by Equinix and NTT DOCOMO BUSINESS at three sites each. The absence of recent deal activity—no acquisitions, stakes, or partnerships recorded—contrasts with broader Japan momentum, where CapitaLand has acquired Osaka data center assets from Mitsui, and Itochu plans ten new facilities nationally by 2030. Kansai, the broader region encompassing Osaka, has emerged as a secondary data center hub as primary markets saturate, yet Osaka itself has not captured corresponding M&A or greenfield announcement volume.
| Facility | Operator | Status | MW |
|---|---|---|---|
| AirTrunk OSK2 Osaka | AirTrunk | Under Construction | 100 |
| STACK KIX01 Osaka | STACK Infrastructure | Under Construction | 30 |
| AWS AP Northeast 3 (Osaka) | Amazon Web Services | Operational | |
| AirTrunk OSA1 Osaka | AirTrunk | Operational | |
| Azure Japan West Osaka | Microsoft | Operational | |
| KAGOYA データセンター A棟 | カゴヤ・ジャパン株式会社 | Operational | |
| NTT DOCOMO BUSINESS OS4 - Osaka | NTT DOCOMO BUSINESS (Data Centers) | Operational | |
| NTT Kitahama Data Center(Dojima Campus) | NTT SmartConnect Corporation | Operational | |
| OPTAGE – OC1(Sonezaki DC) | OPTAGE Inc. | Operational | |
| Vantage Osaka Japan | Vantage Data Centers | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Japan.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Osaka: 130 MW tracked, any status — live, cited, and queryable by API or MCP.