Northlake data center market

Power availability in Northlake: DCPI verdict AVOID, composite score 19.9 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 277 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score19.9/100
MW, all listings28sum of the sites that report MW; most do notany status, unverified listings included
VerdictAVOID

Northlake at a glance

Northlake has 28 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Aligned (28 MW).

Capacity by status, as of 2026-11-12
StatusMW
Operational28
Total listed28

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Northlake

DC Hub does not hold a lease-rate figure for this market yet.

One tracked site reports operational megawattage, though aggregate capacity figures are not available across the market. The operator roster reflects regional consolidation, with single-site operators including Ascent, LLC and others alongside the dual-operator presence of Aligned entities and Microsoft's Chicago-based infrastructure.

This combination signals that available grid headroom is limited relative to existing demand, and spare generation capacity within tracked facilities remains modest. Together these readings suggest that securing incremental power supply to support new builds or expansions will face both grid-side and facility-side tightness.

Aligned Data Centers' substantial three-facility presence and Microsoft's two-site footprint represent the dominant infrastructure anchors; no incoming operators or facility acquisitions appear in the current transaction log.

Forward visibility hinges on whether grid upgrades or facility-level power augmentation projects move forward in the near term.

Data centers in Northlake

FacilityOperatorStatusMW
Aligned ChicagoAlignedOperational28
Aligned Chicago (ORD-01)Aligned Data CentersOperational
Aligned Chicago (ORD-02)Aligned Data CentersOperational
Ascent - CH2Ascent, LLCOperational
Digital Realty CHI (505 N Railroad)Digital RealtyOperational
MICROSOFT CORP-CHICAGO DATA CENTERMicrosoftDuplicate
Microsoft - Azure DatacenterMicrosoftOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Illinois.

More on Northlake

Email me when the Northlake DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Northlake: 28 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/northlake/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load