Power availability in New York (New York Metro): DCPI verdict CAUTION, composite score 45 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 276 words · generated 2026-11-10 from live DC Hub data · DCPI live as of 2026-11-12
New York has 221 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Equinix (100 MW), Sabey Data Centers (45 MW) and CoreSite (35 MW).
| Status | MW |
|---|---|
| Operational | 221 |
| Total listed | 221 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: CBRE / JLL market reports, H1 2025 (as held by DC Hub)
This tension—adequate surplus paired with structural procurement difficulty—defines the current environment.
The CAUTION verdict reflects a market where incremental power remains obtainable but not easily. This combination typically emerges where grid infrastructure, permitting, or utility interconnection timelines create bottlenecks despite raw supply availability. For operators and site developers, the implication is straightforward: new power is not scarce in aggregate, but securing it requires navigating regulatory and infrastructure friction that can extend project timelines.
Recent deal activity shows consolidation and infrastructure investment rather than capacity transactions. Pilot Fiber's fiber business serving the New York/New Jersey metro transferred to Boldyn Networks in October 2026, signaling transport capacity redeployment in the region. NYDIG's $315M acquisition, while originating in New York, provides context for operator consolidation patterns but does not reveal capacity-specific terms.
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in New York.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
New York: 398 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/new-york/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-10, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load