Nashville data center market

Power availability in Nashville: DCPI verdict AVOID, composite score 27.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 288 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score27.7/100
MW, all listings112sum of the sites that report MW; most do notany status, unverified listings included
VerdictAVOID

Nashville at a glance

Nashville has 112 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Meta (100 MW) and 365 Data Centers (12 MW).

Capacity by status, as of 2026-11-12
StatusMW
Operational112
Total listed112

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Nashville

Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: DC Hub estimate. Nearest covered market Atlanta (CBRE North America Data Center Trends H1 2026 (250+ kW): (figure on paid plans)) less the secondary-market discount seen in CBRE H1 2026 (figure on paid plans); TN industrial power ~6.8 c/kWh (EIA via DC Hub).

The market has recorded no recent power-and-supply deals tracked by DC Hub, leaving the current operator structure and capacity distribution static over the measured period.

Together, these readings mean new facility buildouts or expansions will face material lead times and cost structures around power sourcing, not insurmountable barriers but real friction points that affect project economics and timeline.

Operator concentration remains stable with no tracked deal activity. The absence of recent M&A, investment rounds, or capacity acquisitions suggests the market is neither consolidating nor expanding through large capital moves. Zoning and permitting friction—evidenced by public opposition to proposed facilities near the Nashville Zoo and broader Tennessee community pushback against data center siting—may be suppressing deal visibility or delaying project announcements rather than eliminating demand.

Data centers in Nashville

FacilityOperatorStatusMW
Meta Gallatin Data CenterMetaOperational100
365 DC Nashville365 Data CentersOperational12
EdgeConneX Nashville (EDCNAS01)EdgeConneX Inc.Operational
Flexential Brentwood Data CenterOperational
Flexential Nashville - BrentwoodFlexentialOperational
Flexential Nashville - Cool SpringsFlexentialOperational
Flexential Nashville - FranklinFlexentialOperational
H5 Data Centers Nashville365 Data CentersOperational
H5 Data Centers Nashville (TN01)H5 Data CentersOperational
Level(3) Nashville (9th Ave)Lumen TechnologiesOperational
Level(3) Nashville (Sidco Drive)Lumen TechnologiesOperational
Nashville - Cool SpringsFlexentialOperational
Peace Communications NSH2Peace Communications (Formerly Nexus Group)Operational
Tennessee South Data CenterState of TennesseeOperational
TierPoint Nashville TNTierPointOperational
Verizon WirelessOperational
XO NashvilleXOOperational
Zayo Nashville - 209 10th Ave. SZayo GroupOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Tennessee.

More on Nashville

Email me when the Nashville DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Nashville: 112 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/nashville/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load