Moses Lake data center market

Power availability in Moses Lake: DCPI verdict CAUTION, composite score 47.1 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 281 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score47.1/100
MW, all listings310sum of the sites that report MW; some do notany status, unverified listings included
VerdictCAUTION

Moses Lake at a glance

Moses Lake has 310 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Microsoft (150 MW), Prime Data Centers (100 MW) and Edged (60 MW).

Capacity by status, as of 2026-11-12
StatusMW
Operational310
Total listed310

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Moses Lake

DC Hub does not hold a lease-rate figure for this market yet.

Moses Lake hosts 310 MW across four tracked facilities operated by Edged, Microsoft, Prime Data Centers, and Serverfarm. The market remains fragmented among multiple operators with no single dominant player, and no recent deal activity has been recorded in the tracked registry.

Together, these scores suggest that adding new capacity or expanding existing facilities will require deliberate power procurement planning and likely involve engagement with regional grid operators and utility infrastructure timelines.

No recent deals have been tracked in Moses Lake, and operator composition remains stable. The four-way split among Edged, Microsoft, Prime Data Centers, and Serverfarm suggests a market without clear recent consolidation or capital reallocation. Regional developments bear monitoring: Keel has publicly advanced plans for an onsite backup power system at its Moses Lake facility, signaling operator confidence in long-term operations at the site. AWS has moved forward with its first data center project in Washington State, though that facility is sited in adjacent Walla Walla rather than Moses Lake, underscoring that hyperscaler expansion in the region does not automatically flow to every local market.

Data centers in Moses Lake

FacilityOperatorStatusMW
Microsoft Moses LakeMicrosoftOperational150
Prime Moses LakePrime Data CentersOperational100
Edged Moses LakeEdgedOperational60
Serverfarm TiTAN Moses LakeServerfarmOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Washington.

More on Moses Lake

Email me when the Moses Lake DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Moses Lake: 310 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/moses-lake/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load