Montgomery data center market

Power availability in Montgomery: DCPI verdict AVOID, composite score 23.4 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 230 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score23.4/100
MW, all listings304sum of the sites that report MW; most do notany status, unverified listings included
VerdictAVOID

Montgomery at a glance

Montgomery has 77 MW under construction and 75 MW planned among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Meta (152 MW).

Capacity by status, as of 2026-11-12
StatusMW
Under construction77
Planned75
Total listed152

Developers building or planning in Montgomery

OperatorUnder construction MWPlanned MW
Meta7775

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Montgomery

DC Hub does not hold a lease-rate figure for this market yet.

Meta Platforms operates the largest deployed presence with multiple sites in the region, alongside infrastructure from Verizon Montgomery, DOTIER LLC, and the Retirement Systems of Alabama. No recent power purchase agreements or capacity expansions have been recorded in the transaction registry.

The combination yields an AVOID designation specifically for power procurement planning. Sites seeking to expand or newly build in Montgomery will encounter extended lead times for utility upgrades and elevated costs for grid capacity requests. This is not a statement about demand; it reflects the practical mechanics of adding MW to the local supply chain.

Operator concentration remains high, with Meta operating six of fourteen tracked sites. Deal flow has stalled entirely—no recent transactions appear in the tracked registry, contrasting with broader sector momentum where major platforms continue to secure capacity in other regions. Verizon Montgomery's single tracked site and RSA's entry indicate some operator diversity, yet the footprint remains heavily weighted toward Meta's internal build program.

Data centers in Montgomery

FacilityOperatorStatusMW
Meta Montgomery Building 1MetaUnder Construction75
Meta Montgomery Building 2MetaPlanned75
Meta Montgomery Data CenterMetaUnder Construction2
Houston BunkerThe Houston BunkerOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Alabama.

More on Montgomery

Email me when the Montgomery DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Montgomery: 304 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/montgomery/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load