Power availability in Monroe: DCPI verdict AVOID, composite score 31.3 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 196 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12
Monroe has 250 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Meta (250 MW).
| Status | MW |
|---|---|
| Under construction | 250 |
| Total listed | 250 |
| Operator | Under construction MW | Planned MW |
|---|---|---|
| Meta | 250 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
Monroe's tracked footprint comprises three facilities, with only one operator publicly reporting capacity metrics. Meta operates a single site in the market. No recent deals have been tracked in Monroe.
This combination yields an AVOID verdict for parties planning to source new power in this market.
Operator presence is concentrated: Meta represents the sole tracked operator. The absence of recent deal activity in Monroe suggests either market saturation among existing participants or limited near-term expansion interest in the region.
Forward planning in Monroe will likely depend on utility dialogue around incremental grid capacity rather than self-help power procurement strategies.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Meta Monroe NC Campus | Meta | Under Construction | 250 |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in North Carolina.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Monroe: 250 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/monroe/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load