Modesto data center market

Power availability in Modesto: DCPI verdict CAUTION, composite score 50.9 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 266 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score50.9/100
MW, all listings0any status, unverified listings included
VerdictCAUTION

Colocation lease rates in Modesto

DC Hub does not hold a lease-rate figure for this market yet.

Modesto has three tracked facilities operated by Ayera Technologies, Volt Broadband, and Yosemite Community College District, with no recent deal activity recorded. Only one operator in the tracked set has reported megawatt figures to the database. The region sits at an inflection point between available generation capacity and grid access friction.

The DCPI verdict of CAUTION reflects a mixed signal on incremental power procurement. New entrants should expect moderate difficulty in securing firm power contracts and interconnection capacity, particularly given the upstream grid topology serving the Central Valley.

Deal flow has stalled: no transactions have been tracked in recent periods. The operator base remains small and fragmented, with no single entity commanding scale. Community reaction to potential data center development has intensified—public opposition mounted at city hall and irrigation board meetings reflects local sensitivity to land use, water demand, and grid stress. These dynamics do not alter power supply facts, but they shape the permitting and political environment in which power infrastructure must be sited and constructed.

Data centers in Modesto

FacilityOperatorStatusMW
801 Tenth Street Modesto (Ayera)Ayera Technologies, Inc.Operational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in California.

More on Modesto

Email me when the Modesto DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Modesto market data is live in DC Hub — cited and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/modesto/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load