Miami data center market

Power availability in Miami: DCPI verdict AVOID, composite score 29.9 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 254 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score29.9/100
MW, all listings15sum of the sites that report MW; most do notany status, unverified listings included
VerdictAVOID

Miami at a glance

Miami has 15 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Thor Equities (15 MW).

Capacity by status, as of 2026-11-12
StatusMW
Operational15
Total listed15

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Miami

DC Hub does not hold a lease-rate figure for this market yet.

Recent coverage from USA Today and Axios has highlighted both active development and regulatory scrutiny around neighborhood-scale deployments, while Miami Herald reporting documents county-level application backlogs tied to development moratoria in adjacent jurisdictions.

The Data Center Power Index verdict of AVOID reflects a structural mismatch in Miami's power infrastructure. This combination suggests that new entrants or expansion projects should expect delays in power delivery and elevated coordination costs with Florida's regional transmission operators.

Deal flow in Miami remains dormant relative to peer markets: no recent acquisitions or capacity sales are tracked. Equinix and DataBank's presence anchors the operator base, with 3HCLOUD LLC and Volico each running two sites.

Data centers in Miami

FacilityOperatorStatusMW
Thor Miami 1Thor EquitiesOperational15
Cogent Boca RatonCogent Communications, Inc.Operational
CoreSite - Miami (MI1)CoreSiteOperational
Digital Realty MIA (36 NE 2nd St)Digital RealtyOperational
Digital Realty MIA1 MiamiDigital RealtyOperational
EdgeConneX Miami (EDCMIA01)EdgeConneX Inc.Operational
EdgeConneX Miami (EDCMIA02)EdgeConneX Inc.Operational
Encore Technologies MSB1Encore TechnologiesOperational
Equinix MI1 - Miami, NOTAEquinixOperational
Equinix MI2 - MiamiEquinixOperational
Equinix MI3 - Miami, Boca RatonEquinixOperational
Iron Mountain Data Center - Ohio (OHS-1)Iron Mountain Data CentersOperational
Level(3) Miami (5th St)Lumen TechnologiesOperational
MDC1 - 36 NE 2nd StColocation America CorporationOperational
NAP of the AmericasOperational
NWT Data CenterBiznesshosting, Inc. DBA VOLICOOperational
QTS Miami (MIA1)QTSOperational
South Reach NetworksOperational
Telefonica KeyCenterOperational
Telxius Boca Raton DCTelxius CableOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Florida.

More on Miami

Email me when the Miami DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Miami: 15 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/miami/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load