Melbourne data center market

Power availability in Melbourne: DCPI verdict AVOID, composite score 24.2 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 268 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score24.2/100
MW, all listings1,720sum of the sites that report MW; most do notany status, unverified listings included
VerdictAVOID

Melbourne at a glance

Melbourne has 22 MW operational and 758 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are AirTrunk (708 MW), STACK Infrastructure (50 MW) and Equinix (22 MW).

Capacity by status, as of 2026-11-12
StatusMW
Operational22
Under construction758
Total listed780

Developers building or planning in Melbourne

OperatorUnder construction MWPlanned MW
AirTrunk708
STACK Infrastructure50

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Melbourne

DC Hub does not hold a lease-rate figure for this market yet.

The market has absorbed significant capacity build-out, though no recent deals have been tracked in the acquisition or investment pipeline.

The DCPI verdict of AVOID reflects conflicting power dynamics. This dual reading suggests the market has hit a supply-ceiling: available grid infrastructure cannot easily accommodate incremental load without capital-intensive augmentation. NextDC flagged earnings risk tied to a Melbourne data center power delay, underscoring that expansion projects face real delays in securing new supply commitments.

Active pipeline signals point to ongoing developer interest despite power headwinds. A filing exists for a 200 MW facility targeting the South Morang Terminal Station area, while HyperDC has filed plans for a 400 MW campus outside Geelong near an existing substation and battery energy storage project. No recent acquisition or investment deals have been recorded in Melbourne proper, though regional activity in Geelong suggests developers are testing adjacent sites to bypass central Melbourne's power bottleneck.

Power procurement dynamics will remain the primary friction point for new build commitments in Melbourne through the near term.

Data centers in Melbourne

FacilityOperatorStatusMW
AirTrunk MEL2 MelbourneAirTrunkUnder Construction354
AirTrunk MelbourneAirTrunkUnder Construction354
STACK MelbourneSTACK InfrastructureUnder Construction50
Equinix ML1EquinixOperational22
AAPT Data CentreOperational
AirTrunkOperational
Azure Australia Southeast MelbourneMicrosoftOperational
CDC LavertonCanberra Data CentresOperational
DXC TechnologyOperational
Equinix ME1EquinixOperational
Equinix ME2 MelbourneEquinixOperational
Melbourne, AustraliaVantage Data CentersOperational
Microsoft MEL11MicrosoftOperational
NTT Melbourne DC1NTTOperational
Oracle Cloud Australia MelbourneOracleOperational
Stack Infrastructure MEL01BStackOperational
Telstra Clayton Data CentreTelstraOperational
Vantage Melbourne AustraliaVantage Data CentersOperational
Vocus DC-MEL04 Mitcham Data CentreOperational
Vocus Melbourne MEL03Vocus GroupOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Australia.

More on Melbourne

Email me when the Melbourne DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Melbourne: 1,720 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/melbourne/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load