Power availability in Lynnwood: DCPI verdict CAUTION, composite score 49.4 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 268 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12
DC Hub does not hold a lease-rate figure for this market yet.
Lynnwood hosts five tracked facilities across four operators, with no recent deal activity on record. Centersquare, Digital Fortress (operating two sites in the market), and Unity Cable System maintain the only active presences. The operator base remains stable but narrow, and no capacity figures have been reported by any tracked site.
The DCPI verdict of CAUTION reflects mixed signals on power supply dynamics.
No recent deals have been tracked in Lynnwood, and the operator roster shows no consolidation or new-entrant activity. This absence does not reflect broader Pacific Northwest hesitation—regional operators including US Signal and Sabey Data Centers have announced expansion activity in adjacent areas—but rather suggests that Lynnwood has not been the focus of recent M&A. The four-operator field is neither fragmented nor dominated; the presence of two Digital Fortress sites alongside single assets held by Centersquare and Unity Cable System indicates a distributed competitive structure.
Power procurement remains the key variable for any new project in this market: operators should expect to negotiate grid access and incremental supply at terms reflecting moderate scarcity rather than abundance, and feasibility studies should account for extended interconnection timelines.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Centersquare Lynnwood SE1 | Centersquare | Operational | |
| Digital Fortress Lynnwood | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Washington.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Lynnwood market data is live in DC Hub — cited and queryable by API or MCP.
JSON: /api/v1/markets/lynnwood/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load