Power availability in Los Angeles: DCPI verdict CAUTION, composite score 47.5 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 228 words · generated 2026-11-10 from live DC Hub data · DCPI live as of 2026-11-12
Los Angeles has 303 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Equinix (80 MW), Digital Realty (74 MW) and CoreSite (70 MW).
| Status | MW |
|---|---|
| Operational | 303 |
| Total listed | 303 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: CBRE North America Data Center Trends H1 2026 (250+ kW): Southern California (figure on paid plans) (link)
No recent deal activity has been tracked in the Los Angeles market segment.
This combination signals that while additional power supply routes may exist, securing new capacity will face meaningful interconnection, transmission, or procurement friction.
Operator concentration remains moderate. Equinix's seven-site presence represents the largest single footprint but accounts for less than 3.5% of tracked facilities, underscoring the market's polyglot structure. CoreSite, Digital Realty, Colocation America Corporation, and Enzu round out the top five, each managing between four and six sites. The absence of recent deal flow prevents assessment of consolidation velocity or operator repositioning activity.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Equinix LA Campus | Equinix | Operational | 80 |
| CoreSite LA Campus | CoreSite | Operational | 70 |
| Digital Realty LAX | Digital Realty | Operational | 60 |
| T5@Los Angeles | T5 Data Centers | Operational | 45 |
| ServerFarm Los Angeles | ServerFarm | Operational | 28 |
| DRT LAX12 | Digital Realty | Operational | 14 |
| Centurylink | Operational | 6 | |
| 800 south hope | Thomas Properties Group | Operational | |
| ColoCrossing LA1 | ColoCrossing | Operational | |
| CoreSite - Los Angeles (LA1) One Wilshire | CoreSite | Operational | |
| CoreSite - Los Angeles (LA2) | CoreSite | Operational | |
| Crown Castle Los Angeles (624 S Grand) | Crown Castle Inc. | Operational | |
| Digital Realty LAX (2260 E El Segundo) | Digital Realty | Operational | |
| Digital Realty LAX (600 W 7th) | Digital Realty | Operational | |
| Digital Realty LAX39 El Segundo | Digital Realty | Operational | |
| Equinix LA1 - Los Angeles | Equinix | Operational | |
| Equinix LA2 El Segundo | Equinix | Operational | |
| Equinix LA3/LA4 - Los Angeles, El Segundo | Equinix | Operational | |
| Equinix LA7 - Los Angeles | Equinix | Operational | |
| Fireline Data Center | Fireline Network Solutions, Inc | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in California.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Los Angeles: 303 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/los-angeles/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-10, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load