Power availability in London: DCPI verdict AVOID, composite score 10.1 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 269 words · generated 2026-11-10 from live DC Hub data · DCPI live as of 2026-11-12
London has 362 MW operational and 2 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are CloudHQ (70 MW), ServerFarm (62 MW) and Global Switch (46 MW).
| Status | MW |
|---|---|
| Operational | 362 |
| Under construction | 2 |
| Total listed | 364 |
| Operator | Under construction MW | Planned MW |
|---|---|---|
| ServerFarm | 2 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: CBRE Global Data Center Trends 2026, Figure 5 (Monthly Pricing for 250-to-500-kW Capacity by Market, Q1 2026): London (figure on paid plans) (link)
The market continues to attract development interest, with recent planning approvals including a 50,000 sqm facility in West London designated for 64 MW of electrical draw and 48 MW of IT load, and a 180 MW development proposal filed for an East London brownfield site in Charlton. Telehouse acquired a Docklands office campus with plans for a 65 MW data center adjacent to its existing London operation.
This combination indicates that grid access and power availability represent material blockers for greenfield or expanded build-out, not demand or market quality concerns. New entrants and capacity expansions should expect protracted grid connection timelines and potential need for alternative power sourcing strategies.
Recent deal flow reflects consolidation and site assembly rather than wholesale capacity transactions. Arcus executed three acquisitions with Volta on consecutive dates in early July 2026, followed by an acquisition from Verne on 9 July 2026, indicating rapid portfolio consolidation in the region. Separately, Blackstone entered a lease arrangement with an unspecified counterparty on 21 October 2026.
| Facility | Operator | Status | MW |
|---|---|---|---|
| CloudHQ London | CloudHQ | Operational | 70 |
| Global Switch London East | Global Switch | Operational | 46 |
| ServerFarm LON1 London | ServerFarm | Operational | 30 |
| ServerFarm London | ServerFarm | Operational | 30 |
| Interxion LON2 | Interxion | Operational | 25 |
| NTT London 1 | NTT | Operational | 25 |
| Interxion LON1 | Interxion | Operational | 20 |
| CyrusOne LON2 | CyrusOne | Operational | 19 |
| Digital Realty | Operational | 14 | |
| Digital Realty LHR13 | Digital Realty | Operational | 14 |
| The Chess Building | Digital Realty | Operational | 14 |
| Digital Realty | Operational | 10 | |
| Braham Street Data Centre | Level 3 Communications | Operational | 5 |
| Cable & Wireless Data Centre | Cable & Wireless | Operational | 5 |
| Morgan Stanley | Operational | 5 | |
| Pulsant South London | Pulsant | Operational | 5 |
| Skyways | Verizon | Operational | 5 |
| Telehouse East | Telehouse | Operational | 5 |
| Telehouse North | Telehouse | Operational | 5 |
| Telehouse West | Telehouse | Operational | 5 |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in United Kingdom.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
London: 791 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/london/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-10, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load