Little Rock data center market

Power availability in Little Rock: DCPI verdict CAUTION, composite score 50.4 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 221 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score50.4/100
MW, all listings150sum of the sites that report MW; most do notany status, unverified listings included
VerdictCAUTION

Little Rock at a glance

Little Rock has 150 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are AVAIO Digital (150 MW).

Capacity by status, as of 2026-11-12
StatusMW
Under construction150
Total listed150

Developers building or planning in Little Rock

OperatorUnder construction MWPlanned MW
AVAIO Digital150

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Little Rock

DC Hub does not hold a lease-rate figure for this market yet.

Little Rock's data center market comprises five tracked facilities across a fragmented operator base, with no recent deal activity on record. AVAIO Digital, Mainstream Technologies (operating under two entity names), and TierPoint (similarly split across two registered entities) each hold single-site positions in the market. The operator composition reflects minimal consolidation, with no dominant player and no clear signals of recent M&A reshaping the landscape.

This pairing suggests that new projects will face meaningful obstacles in securing grid interconnection, transmission upgrades, or power purchase agreements—even where generation capacity exists regionally.

The five-operator structure—each holding single facilities—suggests a market not yet dominated by portfolio-scale operators or roll-up activity. TierPoint's dual entity presence and Mainstream Technologies' similar split may reflect subsidiary structures or legacy naming rather than growth consolidation.

Forward momentum depends on resolution of local policy and transmission infrastructure, both of which remain in flux based on recent municipal deliberation around data center development.

Data centers in Little Rock

FacilityOperatorStatusMW
AVAIO Digital Leo (Little Rock Campus)AVAIO DigitalUnder Construction150
Mainstream Little RockMainstream Technologies, IncOperational
TIerPoint Little RockTierPoint, LLCOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Arkansas.

More on Little Rock

Email me when the Little Rock DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Little Rock: 150 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/little-rock/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load