Power availability in Lenoir: DCPI verdict AVOID, composite score 31.3 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 231 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12
Lenoir has 200 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Google (200 MW).
| Status | MW |
|---|---|
| Operational | 200 |
| Total listed | 200 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
Lenoir hosts four tracked facilities across two major operators and one smaller player, with limited public capacity reporting. Google operates two sites in the market, while Centrilogic and Dacentec each operate one. Only one facility reports megawatt figures to DC Hub's tracking system, making aggregate footprint assessment impossible. No recent deal activity has been recorded in Lenoir.
The DCPI verdict of AVOID reflects acute supply-side friction. Together, these scores suggest that securing new power supplies—whether through utility interconnection, direct purchase agreements, or generator installation—faces material headwinds relative to other markets.
Operator concentration remains modest. Google's presence across two sites establishes it as the leading incumbent, but the participation of regional and smaller players (Centrilogic, Dacentec) indicates a fragmented competitive landscape rather than monopolistic control. The absence of tracked acquisition or sale activity over the review period reflects dormancy in deal flow; no transactions have been announced or recorded that would signal capital redeployment, consolidation, or entry by new operators into Lenoir.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Google Lenoir Data Center | Operational | 200 |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in North Carolina.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Lenoir: 200 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/lenoir/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load