Power availability in Leesburg: DCPI verdict AVOID, composite score 20.8 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 257 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12
Leesburg has 105 MW operational and 100 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are STACK Infrastructure (100 MW), Google (80 MW) and True North Data Solutions (25 MW).
| Status | MW |
|---|---|
| Operational | 105 |
| Under construction | 100 |
| Total listed | 205 |
| Operator | Under construction MW | Planned MW |
|---|---|---|
| STACK Infrastructure | 100 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
True North Data Solutions operates the largest footprint with six facilities, while Amazon Web Services and Google each maintain three sites in the market. The operator base remains concentrated: these three entities account for 12 of the 48 tracked sites, leaving substantial capacity distributed among smaller players and unverified listings.
These readings suggest that new power availability will be a primary friction point for any facility requiring incremental supply beyond existing contractual commitments.
Deal flow remains sparse. Regional headlines confirm ongoing demand for data center land in Virginia, though a contemporaneous push for a state moratorium on new data center development reflects political pressure in Loudoun County, where Leesburg is located. Operator positioning shows no evidence of portfolio shifts; the six-to-three distribution of facilities among the top three operators remains stable in available data.
Power scarcity will likely shape facility economics and timeline expectations for any new or expanded deployments in Leesburg over the coming cycle.
| Facility | Operator | Status | MW |
|---|---|---|---|
| STACK NVA06 Leesburg | STACK Infrastructure | Under Construction | 100 |
| Google Data Center | Operational | 80 | |
| 42254 THUNDERBALL DR | True North Data Solutions | Operational | 5 |
| 42255 THUNDERBALL DR | True North Data Solutions | Operational | 5 |
| 42310 THUNDERBALL DR | True North Data Solutions | Operational | 5 |
| 42311 THUNDERBALL DR | True North Data Solutions | Operational | 5 |
| TikTok Data Center | True North Data Solutions | Operational | 5 |
| STACK INFRASTRUCTURE - SI NVA06A LLC | STACK Infrastructure | ||
| Stonewall Creek Business Park | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Virginia.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Leesburg: 205 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/leesburg/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load