Power availability in Lebanon: DCPI verdict CAUTION, composite score 44.2 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 277 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12
Lebanon has 250 MW under construction and 752 MW planned among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Meta (1,002 MW).
| Status | MW |
|---|---|
| Under construction | 250 |
| Planned | 752 |
| Total listed | 1,002 |
| Operator | Under construction MW | Planned MW |
|---|---|---|
| Meta | 250 | 752 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
The market shows concentration among three primary operators, with ORLA LLC and CYRUSONE LLC—Lebanon Data Center each operating single facilities. No recent deal activity has been recorded in the tracked dataset.
This pairing suggests that while absolute power availability exists, procurement pathways for new facilities face operational headwinds. New capacity additions will encounter non-trivial delays in grid interconnection, transmission upgrades, or power purchase agreement negotiation.
The operator roster reflects established multinational and regional players without visible recent transaction flow. Meta's dual-branding presence (11 combined facilities) anchors the market, while CyrusOne's five-site footprint represents diversified regional investment. The absence of recorded recent deals does not indicate dormancy; rather, it reflects either deal confidentiality common in Lebanese infrastructure, private operator activity below tracking thresholds, or consolidation pauses among existing majors. Smaller operators occupy the long tail, with single-facility holdings suggesting either specialized build-to-suit models or boutique service provision.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Meta Lebanon Building 1 | Meta | Under Construction | 250 |
| Meta Lebanon Building 2 | Meta | Planned | 250 |
| Meta Lebanon Building 3 | Meta | Planned | 250 |
| Meta Lebanon Building 4 | Meta | Planned | 250 |
| Meta Lebanon Data Center | Meta | Planned | 2 |
| CyrusOne Cincinnati-Lebanon | CyrusOne | Operational | |
| CyrusOne Lebanon | CyrusOne Inc. | Operational | |
| DARTMOUTH COLLEGE DATA CENTER | |||
| Lebanon, OH, CIN5 | CyrusOne | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Indiana.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Lebanon: 3,004 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/lebanon/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load