Katy data center market

Power availability in Katy: DCPI verdict CAUTION, composite score 45.8 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 233 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score45.8/100
MW, all listings100sum of the sites that report MW; most do notany status, unverified listings included
VerdictCAUTION

Katy at a glance

Katy has 100 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are ServerFarm (100 MW).

Capacity by status, as of 2026-11-12
StatusMW
Operational100
Total listed100

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Katy

DC Hub does not hold a lease-rate figure for this market yet.

Katy's tracked data center footprint comprises five facilities operated by EdgeConneX (two distinct entities), Element Critical, ServerFarm, and Skybox. The market shows fragmented operator presence with no single dominant player. Only one tracked site publicly reports power capacity figures, limiting visibility into aggregate supply metrics for the market.

The DCPI verdict of CAUTION reflects conflicting signals on power availability. Operators planning capacity expansion should expect power procurement to require longer lead times or premium terms relative to unconstrained markets.

No recent deals have been tracked in Katy's registry. This absence of M&A or capacity transaction activity reflects either stable operator holdings or limited third-party acquisition flow in the market. Without recent transaction data, operator capital plans, growth timelines, or exit intentions remain opaque.

Katy's position within the greater Houston market area positions it as a potential secondary site for operators seeking alternatives to core urban corridors, though no deal activity has materialized to confirm that interest locally.

Data centers in Katy

FacilityOperatorStatusMW
ServerFarm HTX1 HoustonServerFarmOperational100
EdgeConneX Houston (EDCHOU01)EdgeConneX Inc.Operational
Element Critical Houston HOU1Element Critical, LLCOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Texas.

More on Katy

Email me when the Katy DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Katy: 100 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/katy/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load