Power availability in Johannesburg: DCPI verdict AVOID, composite score 21.5 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 196 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score21.5/100
MW, all listings103sum of the sites that report MW; most do notany status, unverified listings included
VerdictAVOID

Johannesburg at a glance

Johannesburg has 103 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Teraco (48 MW), Vantage Data Centers (35 MW) and Africa Data Centres (20 MW).

Capacity by status, as of 2026-11-12
StatusMW
Operational103
Total listed103

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Johannesburg

DC Hub does not hold a lease-rate figure for this market yet.

Teraco leads the operator roster with seven tracked sites, followed by Vantage Data Centers with four and NTT with three. The market has seen recent sector activity elsewhere in South Africa—Open Access Data Centres was acquired as a platform asset—but no recent deals have been tracked in Johannesburg itself.

This combination indicates that securing new power allocations will face both availability and infrastructure barriers. Operators expanding footprints here cannot rely on abundant spare capacity or frictionless grid access.

Deal flow into Johannesburg has stalled recently, with no tracked transactions recorded. Teraco's seven-site portfolio represents the largest operational presence, while Vantage's four facilities and NTT's three holdings reflect a market concentrated among established regional and global operators.

Data centers in Johannesburg

FacilityOperatorStatusMW
Vantage JohannesburgVantage Data CentersOperational35
Teraco JB3TeracoOperational30
Africa Data Centres JNB1Africa Data CentresOperational20
Teraco JB1TeracoOperational18
158 Jan Smuts Avenue JohnnesburgNTT DATA, Middle East and Africa (MEA)Operational
Azure South Africa North JohannesburgMicrosoftOperational
Equinix JN1 - JohannesburgEquinixOperational
Google Cloud africa-south1 JohannesburgGoogleOperational
Johannesburg I, South AfricaVantage Data CentersOperational
Liquid Intelligent Tech JohannesburgLiquid TechOperational
Open Access Data Centres JohannesburgOADCOperational
Oracle Cloud South Africa JohannesburgOracleOperational
Teraco JB1 Isando CampusTerao Data EnvironmentsOperational
Teraco JB2 JohannesburgTeracoOperational
Teraco JB5 Isando CampusTeracoOperational
Teraco Johannesburg Bredell CampusTeraco Data Environments Pty LtdOperational
Vantage Johannesburg SAVantage Data CentersOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in South Africa.

More on Johannesburg

Email me when the Johannesburg DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Johannesburg: 103 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/johannesburg/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load