Power availability in Jersey City: DCPI verdict AVOID, composite score 22.1 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 260 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12
This analysis was written on 2026-11-07, when the Data Center Power Index for this market read 22.3. The index is recomputed through the day and reads 22.1 now — the figure above is the live one, and the narrative below describes the market as it stood when it was written.
DC Hub does not hold a lease-rate figure for this market yet.
The market's largest single operator presence is concentrated but modest—no single player dominates the footprint the way peers like Equinix do in adjacent New Jersey markets.
The DCPI verdict flags procurement difficulty for new power supply. Together, these metrics indicate that new projects entering Jersey City will face extended interconnection timelines and elevated infrastructure investment requirements to unlock additional megawatts from the grid.
No recent deals have been tracked in Jersey City's market. Operator activity remains static across the five primary players, with Inap Jersey, QTS, Colt Technology Services New Jersey, and Enzu each maintaining two facilities. Centersquare operates one tracked site. The absence of recent transaction data reflects a quiet market without visible M&A, new site acquisitions, or capacity transactions among tracked operators in the period under review.
Power availability will continue shaping feasibility for any new build or major expansion in Jersey City through 2027.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Dataverge Jersey City | Dataverge Inc. | Operational | |
| Level(3) Jersey City | Lumen Technologies | Operational | |
| Newport Financial Center | Lefrak Organization | Operational | |
| QTS Jersey City (JCY1) | QTS | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in New Jersey.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Jersey City: 100 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/jersey-city/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load