Jakarta data center market

Power availability in Jakarta: DCPI verdict AVOID, composite score 28.3 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 238 words · generated 2026-11-11 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score28.3/100
MW, all listings860sum of the sites that report MW; most do notany status, unverified listings included
VerdictAVOID

Jakarta at a glance

Jakarta has 120 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are PDG (120 MW).

Capacity by status, as of 2026-11-12
StatusMW
Under construction120
Total listed120

Developers building or planning in Jakarta

OperatorUnder construction MWPlanned MW
PDG120

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Jakarta

DC Hub does not hold a lease-rate figure for this market yet.

The market hosts a fragmented operator base led by PDG, BDx DC Services Limited, and NTT DATA's Global Data Centers division, each operating three sites, alongside DCI Indonesia with two facilities. Recent construction activity includes LG CNS's completed AI data center and NTT DATA's JKT2A facility, both positioned for artificial intelligence workloads, while SM+ has launched capacity with cloud provider Konst as an anchor tenant.

No recent tracked deals have been recorded in Jakarta's data center market, contrasting with activity in peer Southeast Asian and broader APAC markets. Operator consolidation trends visible in Tokyo and Singapore have not yet manifested as major transactional activity in Jakarta, with current market structure dominated by smaller regional and local players rather than acquisition-driven consolidation.

Data centers in Jakarta

FacilityOperatorStatusMW
Princeton Digital Jakarta HyperscalePDGUnder Construction120
AWS AP Southeast 3 (Jakarta)Amazon Web ServicesOperational
AirTrunk JKT1 JakartaAirTrunkOperational
Alibaba Cloud Jakarta DCAlibaba CloudOperational
BDx CGK1 - Jakarta City CenterBDx DC Services LimitedOperational
BDx CGK2 - TechnoParkBDx DC Services LimitedOperational
Berkah Solusi Teknologi InformasiPT Berkah Solusi Teknologi InformasiOperational
Bridge Data Centres JakartaBridge DCOperational
CNI DC CBRPT. Cyber Network IndonesiaOperational
DCI Indonesia (E1)DCI IndonesiaOperational
DCI Indonesia JakartaDCI IndonesiaOperational
Equinix JK1 - JakartaEquinixOperational
Global Switch JakartaGlobal SwitchOperational
Google Cloud asia-southeast2 JakartaGoogleOperational
NTT Indonesia Jakarta 2PT. NTT IndonesiaOperational
NTT Jakarta 1 Data Center (JKT1)NTT DATA's Global Data Centers divisionOperational
NTT Jakarta 2 Data Center (JKT2)NTT DATA's Global Data Centers divisionOperational
NeutraDC BekasiNeutraDCOperational
Nodeast Cloud (srv02.semburat)PT Era Daya CiptaOperational
PSN NetworksPT. Pasifik Satelit NusantaraOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Indonesia.

More on Jakarta

Email me when the Jakarta DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Jakarta: 860 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/jakarta/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-11, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load