Hillsboro data center market

Power availability in Hillsboro: DCPI verdict CAUTION, composite score 44.3 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 261 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score44.3/100
MW, all listings435sum of the sites that report MW; most do notany status, unverified listings included
VerdictCAUTION

Hillsboro at a glance

Hillsboro has 85 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Stack Infrastructure (60 MW) and Flexential (25 MW).

Capacity by status, as of 2026-11-12
StatusMW
Operational85
Total listed85

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Hillsboro

Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: CBRE North America Data Center Trends H1 2026 (250+ kW): Hillsboro/Portland (figure on paid plans) (link)

Flexential operates the largest portfolio with 12 tracked sites, followed by Quality Technology Services (10), Stack Infrastructure (7), EdgeConneX (6), and Digital Realty (5). The market's operator base remains distributed, with no single player commanding majority control of tracked capacity.

New entrants and expansion-stage operators should expect moderate lead times for power service agreements and incremental grid studies, particularly if demand concentrates among a handful of nearby sites.

Recent deal activity shows consolidation rather than greenfield expansion. US Signal acquired a Hillsboro data center for $20M, taking over a facility previously occupied by Oracle. This transaction signals secondary-market liquidity and active operator repositioning, though the deal occurred against a backdrop of municipal scrutiny—the city enacted a 120-day moratorium to re-evaluate its data center stance, and operators submitted two projects immediately before the moratorium took effect. The deal flow pattern suggests existing asset reallocation is outpacing new supply announcements in the region.

Data centers in Hillsboro

FacilityOperatorStatusMW
Stack PortlandStack InfrastructureOperational60
Flexential HillsboroFlexentialOperational15
Flexential Portland - Hillsboro 3FlexentialOperational10
CoreWeave Hillsboro OR (Flexential)CoreWeaveOperational
Digital Fortress - Portland 1Digital Fortress, IncOperational
Digital Fortress - Portland 2Digital Fortress, IncOperational
Digital Fortress - Portland 3Digital Fortress, IncOperational
Digital Realty PDX1 PortlandDigital RealtyOperational
Digital Realty PDX10 Data CenterDigital RealtyOperational
Digital Realty PDX11 Data CenterDigital RealtyOperational
Digital Realty Portland - PDX10Digital RealtyOperational
EdgeConneX Data CenterEdgeConneXOperational
EdgeConneX Portland (EDCPOR01)EdgeConneX Inc.Operational
EdgeConneX Portland OREdgeConneXOperational
Flexential - Portland/Hillsboro (PDX01)Flexential Corp.Operational
Flexential - Portland/Hillsboro 2 (PDX02)Flexential Corp.Operational
Flexential - Portland/Hillsboro 4 (PDX04)Flexential Corp.Operational
Flexential Portland - Hillsboro 1FlexentialOperational
Flexential Portland - Hillsboro 2FlexentialOperational
H5 DC - PortlandH5 Data CentersOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Oregon.

More on Hillsboro

Email me when the Hillsboro DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Hillsboro: 435 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →