Power availability in Herndon: DCPI verdict AVOID, composite score 21.8 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 222 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12
DC Hub does not hold a lease-rate figure for this market yet.
The market shows no recent deal activity in the tracked dataset. Operator concentration remains high, with the top two players controlling the majority of identified footprint across the region.
The DCPI verdict of AVOID reflects structural power-supply headwinds. Together, these metrics suggest that incremental power supply will be difficult and costly to secure in Herndon's current infrastructure environment.
Deal flow has stalled. No recent transactions appear in the tracked dataset, leaving operator dynamics frozen at current positions. AWS maintains a 6-site presence, while Equinix operates 3 identified facilities including DC 97. Without new leasing or M&A activity, competitive positioning and capacity expansion plans remain opaque.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Cogent Herndon | Cogent Communications, Inc. | Operational | |
| Level(3) Herndon | Lumen Technologies | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Virginia.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Herndon market data is live in DC Hub — cited and queryable by API or MCP.
JSON: /api/v1/markets/herndon/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load