Henderson data center market

Power availability in Henderson: DCPI verdict CAUTION, composite score 49.5 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 248 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score49.5/100
MW, all listings266sum of the sites that report MW; most do notany status, unverified listings included
VerdictCAUTION

Henderson at a glance

Henderson has 200 MW operational and 66 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Google (266 MW).

Capacity by status, as of 2026-11-12
StatusMW
Operational200
Under construction66
Total listed266

Developers building or planning in Henderson

OperatorUnder construction MWPlanned MW
Google66

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Henderson

DC Hub does not hold a lease-rate figure for this market yet.

Henderson's tracked footprint spans 266 MW across six facilities, with Google operating four sites and JASMINE DEVELOPMENT, LLC managing one, though no recent deal activity has been recorded in this market. The region currently hosts a mix of operational, under-construction, and planned capacity, reflecting ongoing infrastructure development in Nevada's data center corridor. Recent regional reporting indicates developer activity around power infrastructure alternatives, including natural gas plant proposals on BLM land adjacent to hyperscale data center sites.

This configuration signals that while the market has demonstrated power surplus relative to current demand, infrastructure bottlenecks exist that will complicate procurement of incremental capacity. Site developers and operators should expect interconnection timelines and transmission availability to be material factors in project planning, even as raw megawatt supply remains available.

Google's dominant operator footprint—four of six tracked facilities—establishes significant scale concentration in Henderson. The single independent operator presence suggests limited competitive density within the tracked asset base. No recent deals have been recorded, meaning there are no announced acquisitions, sales, or new capacity commitments to signal near-term operator appetite or consolidation activity.

Data centers in Henderson

FacilityOperatorStatusMW
Google Henderson Data CenterGoogleOperational200
Google Henderson Building 3GoogleUnder Construction66
Google Cloud us-west4 Las VegasGoogleOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Nevada.

More on Henderson

Email me when the Henderson DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Henderson: 266 MW tracked, any status — live, cited, and queryable by API or MCP.