Helsinki data center market

Power availability in Helsinki: DCPI verdict AVOID, composite score 30.3 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 267 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score30.3/100
MW, all listings600sum of the sites that report MW; most do notany status, unverified listings included
VerdictAVOID

Helsinki at a glance

Helsinki has 40 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Microsoft (40 MW).

Capacity by status, as of 2026-11-12
StatusMW
Under construction40
Total listed40

Developers building or planning in Helsinki

OperatorUnder construction MWPlanned MW
Microsoft40
Amazon Web Services

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Helsinki

DC Hub does not hold a lease-rate figure for this market yet.

Equinix operates the largest footprint with seven sites, followed by Telia Company with three and Microsoft with two. The OnZero joint venture was announced, though deal terms remain undisclosed.

The DCPI verdict of AVOID reflects structural tension in Helsinki's power supply dynamics. This combination—low headroom paired with moderate-to-high friction—creates a challenging environment for operators planning incremental power additions. Existing operators will face longer lead times and higher coordination complexity when seeking new or expanded power allocations from the local grid.

Deal activity remains thin relative to market size. The OnZero joint venture represents the only recent tracked transaction, suggesting measured M&A velocity in the Helsinki operator base. Equinix's seven-site presence and Telia Company's three-site footprint indicate consolidation around established regional players with existing grid relationships and infrastructure leverage. Microsoft's two tracked facilities reflect selective presence by hyperscale builders rather than aggressive expansion. The absence of major recent acquisition or greenfield announcements in Helsinki proper contrasts with accelerating activity elsewhere in Finland—notably Heim's undisclosed investment round announced in October 2026 and multiple Lapland-based renewable energy projects targeting data center development at substantially larger scales.

Data centers in Helsinki

FacilityOperatorStatusMW
Microsoft Espoo FinlandMicrosoftUnder Construction40
AWS Europe (Finland)Amazon Web ServicesPlanned
DNA LauttasaariDNA OyjOperational
Digita Helsinki Pasila Broadcasting TowerDigita OyOperational
Elisa Helsinki LauttasaariElisa OyjOperational
Equinix HE5 - Helsinki, ViikinmäkiEquinixOperational
Hetzner Helsinki DCHetznerOperational
LocalNet Lauttasaari (Nebula)Telia CompanyOperational
Microsoft Azure Finland SouthMicrosoftPlanned
Telia Espoo Data CenterTeliaOperational
Telia HDCTelia Finland OyjOperational
Telia Helsinki DatacenterTelia CompanyOperational
Verne Global HELSINKIVerne GlobalOperational
atNorth FIN01atNorthOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Finland.

More on Helsinki

Email me when the Helsinki DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Helsinki: 600 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/helsinki/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load