Haymarket data center market

Power availability in Haymarket: DCPI verdict AVOID, composite score 21.8 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 190 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score21.8/100
MW, all listings150sum of the sites that report MW; most do notany status, unverified listings included
VerdictAVOID

Haymarket at a glance

Haymarket has 150 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Amazon Web Services (150 MW).

Capacity by status, as of 2026-11-12
StatusMW
Operational150
Total listed150

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Haymarket

DC Hub does not hold a lease-rate figure for this market yet.

AWS operates six facilities in the market, with an additional three properties listed under AWS in aggregate. The market shows no recent deal activity on record.

The DCPI verdict reflects structural power availability challenges.

Regional deal flow remains dormant in Haymarket specifically, with no tracked transactions in the recent window. AWS's concentration across nine properties (representing the entirety of tracked operators) suggests stability in the installed base, though the absence of new operator entry or facility announcements indicates limited competitive interest in expansion here.

Data centers in Haymarket

FacilityOperatorStatusMW
Amazon IAD-55Amazon Web ServicesOperational50
Amazon IAD64Amazon Web ServicesOperational50
Amazon IAD84Amazon Web ServicesOperational50

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Virginia.

More on Haymarket

Email me when the Haymarket DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Haymarket: 150 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/haymarket/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load