{"comps": {"land": [], "powered_shell": []}, "hero": {"composite_score": null, "computed_at": "2026-11-12T08:45:56.951892+00:00", "constraint_score": null, "excess_power": null, "iso": "WECC", "lat": 33.42, "lng": -112.36, "name": "Goodyear", "queue_wait_months": null, "slug": "goodyear", "state": "AZ", "time_to_power_mo": null, "time_to_power_months": null, "verdict": "BUILD"}, "is_pro": true, "kpis": {"facility_count": 25, "headline_basis": "every facility listing DC Hub tracks in this market (operational, under construction, planned and announced; verified and unverified listings included), deduplicated by name + operator across the facilities and discovered_facilities tables. MW is summed over the listings that report capacity (mw_reporting_count of facility_count), so read it as a floor.", "lease_rate": null, "mw_reporting_count": 12, "operational_mw": 1799.0, "pipeline_mw": 308.0, "queue_months": null, "top_operator": {"facility_count": 7, "name": "Microsoft"}, "total_mw": 1260.0, "unverified_included": true, "vacancy_pct": null}, "live_as_of": {"age_hours": 0.1, "iso": "2026-11-12T08:45:56.951892+00:00"}, "ma": [], "ok": true, "open_access": "Open to every caller: this is one of the 20 largest US data-center markets by tracked capacity, and its full market briefing (grid, risk, time to power, scores) is free.", "operators": [{"facility_count": 7, "operator": "Microsoft", "ranked_by": "facility_count", "total_mw": 150.0}, {"facility_count": 6, "operator": "Vantage", "ranked_by": "facility_count", "total_mw": 449.0}, {"facility_count": 5, "operator": "Vantage Data Centers", "ranked_by": "facility_count", "total_mw": 449.0}, {"facility_count": 1, "operator": "Compass Datacenters", "ranked_by": "facility_count", "total_mw": 212.0}, {"facility_count": 1, "operator": "Compass", "ranked_by": "facility_count", "total_mw": 0.0}], "outlook": {"generated_at": "2026-11-07T05:25:48.435303+00:00", "narrative_md": "Goodyear hosts 25 tracked facilities representing 1,260 MW across operational, under-construction, and planned stages, with Microsoft and Vantage entities operating the largest footprints. Three operators\u2014Microsoft (7 facilities), Vantage (6), and Vantage Data Centers (5)\u2014dominate the deployed and pipeline base.\n\nThe DCPI verdict of BUILD reflects favorable conditions for new power provisioning. This combination suggests the market can absorb greenfield power development without severe interconnection delays or costly backbone upgrades. New facilities entering Goodyear will encounter neither acute scarcity nor abundant spare capacity\u2014the profile supports incremental build activity without requiring major grid reinforcement ahead of operations.\n\nDeal flow in Goodyear remains inactive on the tracked record, with no recent acquisitions or asset transfers logged. Operator concentration remains high; the three leading entities control two-thirds of the tracked base. This static deal environment reflects either equilibrium in the current footprint or a lull between transaction windows. Vantage's multi-entity presence (operating both under the Vantage and Vantage Data Centers banners) underscores how single operators structure multiple legal entities across a single geography. The absence of recent deal activity does not signal market weakness\u2014it indicates operators are provisioning capacity through organic growth rather than M&A.\n\nGoodyear's power and supply dynamics remain oriented toward new-build deployment over the near term.", "rationale": null, "verdict": "BUILD", "word_count": 250}, "pipeline": [{"eta": null, "facility": "Compass Goodyear Campus (Phoenix)", "operator": "Compass Datacenters", "power_mw": 212.0, "status": "Under Construction"}, {"eta": null, "facility": "Novva Project Borealis Phase 1", "operator": "Novva Data Centers", "power_mw": 96.0, "status": "Under Construction"}, {"eta": null, "facility": "Arcadian Infracom Phoenix PoP", "operator": "Arcadian Infracom", "power_mw": null, "status": "Under Construction"}], "power_grid": {"gen_additions_mw": 4640.6, "interconnection_pending_mw": null, "iso": "WECC", "iso_queue": null, "queue_capacity_mw": 13740.0, "queue_wait_months": null, "reserve_margin_pct": null, "time_to_power_as_of": "2026-11-12T08:45:56.951892+00:00", "time_to_power_basis": "DCPI modelled months to energize a new large load in this market (method: https://dchub.cloud/dcpi/methodology); a model estimate, not a utility date", "time_to_power_months": null}, "redirect_to": null, "requested": "goodyear", "risk": {"drought_months_d2_plus": null, "errors": {"drought_months_d2_plus": "no_drought_source_ingested"}, "water_band": 4, "water_band_label": "High", "water_category": "mean of 110 Aqueduct 4.0 baseline-annual basins (arid counted as", "water_stress": 71.8, "wildfire_seismic_note": null}, "slug": "goodyear", "tier": "FREE", "_gated": true, "_locked_fields": ["constraint_score", "excess_power", "excess_power_score", "reserve_margin_pct", "time_to_power_mo", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail unlock with the DC Hub plan with every tool: https://dchub.cloud/pricing."}