Power availability in Fort Worth: DCPI verdict CAUTION, composite score 45 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 239 words · generated 2026-11-06 from live DC Hub data · DCPI live as of 2026-11-12
Fort Worth has 80 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Edged (80 MW).
| Status | MW |
|---|---|
| Under construction | 80 |
| Total listed | 80 |
| Operator | Under construction MW | Planned MW |
|---|---|---|
| Edged | 80 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: CBRE North America Data Center Trends H1 2026 (250+ kW): Dallas-Ft. Worth (figure on paid plans) (link)
QTS Realty and Meta each operate two sites; Alpheus Communications, Centersquare, and other operators hold single facilities. However, no tracked sales, acquisitions, or lease deals have closed recently, leaving operator positioning static.
The DCPI verdict of Caution reflects moderate tension between power availability and demand. Together, these scores signal that incremental power for new facilities is feasible but not assured without grid or utility investment. Operators seeking to add capacity should expect standard lead times for utility coordination rather than either wide-open availability or acute shortage scenarios.
QTS Realty and Meta's dual-site presence in Fort Worth may reflect legacy positioning rather than active expansion; without recent deal records, their investment roadmaps remain opaque. Smaller operators including Alpheus and Centersquare hold single assets, typical of pre-consolidation market structure.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Edged Texas 1 | Edged | Under Construction | 80 |
| Alpheus Fort Worth (307 W 7th St) | Alpheus Communications | Operational | |
| Centersquare Dallas (DFW1) | Centersquare | Operational | |
| Charles Schwab Data Center | Operational | ||
| Cyxtera Dallas-Fort Worth Data Center | Cyxtera | Operational | |
| Novartis | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Texas.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Fort Worth: 80 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/fort-worth/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-06, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load