Power availability in Fayetteville: DCPI verdict AVOID, composite score 25.1 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 289 words · generated 2026-11-06 from live DC Hub data · DCPI live as of 2026-11-12
Fayetteville has 400 MW planned among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Undisclosed Hyperscaler (400 MW).
| Status | MW |
|---|---|
| Planned | 400 |
| Total listed | 400 |
| Operator | Under construction MW | Planned MW |
|---|---|---|
| Undisclosed Hyperscaler | 400 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
Fayetteville operates as a four-facility market with fragmented operator control and minimal transaction velocity. The tracked portfolio includes assets managed by OzarksGo, LLC, QTS, QTS Realty Trust, Inc., and an undisclosed hyperscaler, each holding single-site positions. Only one facility in the market currently reports power capacity metrics to DC Hub, limiting visibility into true aggregate footprint. No recent deals have been tracked in this market.
Deal flow in Fayetteville has stalled entirely. The operator base remains scattered: no single player commands a consolidation position or portfolio scale sufficient to anchor sustained deal flow. QTS appears twice in operator rankings—once as QTS and once as QTS Realty Trust, Inc.—though both entries reference single facilities. The undisclosed hyperscaler's presence indicates that cloud-infrastructure players have established a foothold, yet this has not translated into transaction activity or capacity announcements.
Recent regulatory developments in Fayetteville warrant monitoring, as municipal data center rules adopted by the city council may reshape operating costs and expansion economics for incumbent facilities and new entrants alike.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Fayetteville NC Data Center | Undisclosed Hyperscaler | Planned | 400 |
| OzarksGo Fayetteville | OzarksGo, LLC | Operational | |
| QTS Atlanta-Fayetteville (ATL2) | QTS | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Arkansas.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Fayetteville: 400 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/fayetteville/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-06, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load