Fayetteville data center market

Power availability in Fayetteville: DCPI verdict AVOID, composite score 25.1 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 289 words · generated 2026-11-06 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score25.1/100
MW, all listings400sum of the sites that report MW; most do notany status, unverified listings included
VerdictAVOID

Fayetteville at a glance

Fayetteville has 400 MW planned among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Undisclosed Hyperscaler (400 MW).

Capacity by status, as of 2026-11-12
StatusMW
Planned400
Total listed400

Developers building or planning in Fayetteville

OperatorUnder construction MWPlanned MW
Undisclosed Hyperscaler400

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Fayetteville

DC Hub does not hold a lease-rate figure for this market yet.

Fayetteville operates as a four-facility market with fragmented operator control and minimal transaction velocity. The tracked portfolio includes assets managed by OzarksGo, LLC, QTS, QTS Realty Trust, Inc., and an undisclosed hyperscaler, each holding single-site positions. Only one facility in the market currently reports power capacity metrics to DC Hub, limiting visibility into true aggregate footprint. No recent deals have been tracked in this market.

Deal flow in Fayetteville has stalled entirely. The operator base remains scattered: no single player commands a consolidation position or portfolio scale sufficient to anchor sustained deal flow. QTS appears twice in operator rankings—once as QTS and once as QTS Realty Trust, Inc.—though both entries reference single facilities. The undisclosed hyperscaler's presence indicates that cloud-infrastructure players have established a foothold, yet this has not translated into transaction activity or capacity announcements.

Recent regulatory developments in Fayetteville warrant monitoring, as municipal data center rules adopted by the city council may reshape operating costs and expansion economics for incumbent facilities and new entrants alike.

Data centers in Fayetteville

FacilityOperatorStatusMW
Fayetteville NC Data CenterUndisclosed HyperscalerPlanned400
OzarksGo FayettevilleOzarksGo, LLCOperational
QTS Atlanta-Fayetteville (ATL2)QTSOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Arkansas.

More on Fayetteville

Email me when the Fayetteville DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Fayetteville: 400 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/fayetteville/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-06, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load