Power availability in Enterprise: DCPI verdict CAUTION, composite score 50.9 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 256 words · generated 2026-11-06 from live DC Hub data · DCPI live as of 2026-11-12
DC Hub does not hold a lease-rate figure for this market yet.
The market shows no recent deal activity on record. Power procurement presents a material friction point for operators and prospective entrants, while the operator base remains highly concentrated in a single incumbent.
Deal flow has stalled; no recent transactions are tracked in this market. The operator concentration under Switch across all four tracked facilities suggests either incumbent stability in current positions or limited third-party acquisition appetite for Enterprise-focused assets at present. This divergence may reflect either the specialized or nascent nature of the Enterprise segment relative to hyperscale or colocation markets, or cyclical dormancy in M&A velocity for this operator class.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Switch Las Vegas 14 | Switch | Operational | |
| Switch Las Vegas 7 | Switch | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Nevada.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Enterprise market data is live in DC Hub — cited and queryable by API or MCP.
JSON: /api/v1/markets/enterprise/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-06, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load