Emeryville data center market

Power availability in Emeryville: DCPI verdict CAUTION, composite score 50.3 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 246 words · generated 2026-11-12 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score50.3/100
MW, all listings0any status, unverified listings included
VerdictCAUTION

Colocation lease rates in Emeryville

DC Hub does not hold a lease-rate figure for this market yet.

Emeryville's tracked data center footprint comprises five facilities distributed across four operators, with Lumen Technologies holding two sites and Open Computing Facility, VPLS, and Lumen Technologies Inc each operating single locations. The market shows modest consolidation around incumbent carriers and specialized operators rather than hyperscale dominance. Only one tracked site has submitted operational power data to DC Hub, limiting visibility into aggregate demand patterns and utilization rates across the market.

This combination suggests that adding new power supply to Emeryville sites is feasible but not frictionless—operators should expect to navigate utility interconnection timelines, local transmission limitations, or existing contractual allocations that may delay or restrict deployment of additional megawatts.

Recent deal tracking shows no announced transactions in Emeryville over the current window. The operator roster reflects established regional and national carriers: Lumen's dual presence anchors the market, while OCF and VPLS represent smaller-footprint players. Absence of recent M&A, lease announcements, or expansions does not indicate market softness; rather, it reflects the baseline activity level for a five-site market with primarily mature, operational infrastructure.

Data centers in Emeryville

FacilityOperatorStatusMW
Level(3) OaklandLumen TechnologiesOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in California.

More on Emeryville

Email me when the Emeryville DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Emeryville market data is live in DC Hub — cited and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/emeryville/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-12, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load