Elk Grove Village data center market

Power availability in Elk Grove Village: DCPI verdict AVOID, composite score 19.2 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 254 words · generated 2026-11-12 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score19.2/100
MW, all listings97sum of the sites that report MW; most do notany status, unverified listings included
VerdictAVOID

Elk Grove Village at a glance

Elk Grove Village has 97 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Digital Realty (42 MW), Stack Infrastructure (40 MW) and EdgeConneX (10 MW).

Capacity by status, as of 2026-11-12
StatusMW
Operational97
Total listed97

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Elk Grove Village

DC Hub does not hold a lease-rate figure for this market yet.

Digital Realty operates the largest footprint with five sites, followed by Microsoft and two other operators each running four and three facilities respectively. The market remains fragmented across a relatively small geographic node within the Chicago metropolitan region, with media coverage indicating sustained local awareness of data center operations and their municipal impact.

The DCPI verdict flags Elk Grove as a market to avoid for new power procurement. This combination suggests that operators seeking to expand footprint or add capacity in Elk Grove will face material friction in accessing new power allocations from the grid or existing infrastructure.

Deal activity in Elk Grove has stalled entirely, with no recent transactions tracked in the market. The operator roster—dominated by Digital Realty, Microsoft, EdgeConneX, and T5 Data Centers—appears stable and consolidated, with no recent M&A or divestment activity to signal shifts in market control or investment appetite. Centersquare's two-facility presence rounds out the top-five operator base. The absence of deal flow contrasts with broader regional consolidation visible in adjacent Illinois markets, where larger platform acquisitions and strategic repositioning continue.

Data centers in Elk Grove Village

FacilityOperatorStatusMW
STACK Chicago CHI01Stack InfrastructureOperational40
Digital Realty CH1Digital RealtyOperational14
Digital Realty CH2Digital RealtyOperational14
Digital Realty CH3Digital RealtyOperational14
EdgeConneX CHI01EdgeConneXOperational5
EdgeConneX CHI02EdgeConneXOperational5
Skybox Chicago ISkyboxOperational5
CDC5 - 2200 Busse RdColocation America CorporationOperational
Centersquare Chicago (ORD2)CentersquareOperational
Digital Realty ORD3 Elk GroveDigital RealtyOperational
EQUINIX LLCEquinix
EdgeConneX Chicago (EDCCHI02)EdgeConneX Inc.Operational
Equinix CH3 - Elk GroveEquinixOperational
Forsythe Data CentersOperational
Stream Data Centers - Chicago IIStream Data CentersOperational
T5 Chicago IIT5 Data CentersOperational
T5@ChicagoT5 Data CentersOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Illinois.

More on Elk Grove Village

Email me when the Elk Grove Village DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Elk Grove Village: 97 MW tracked, any status — live, cited, and queryable by API or MCP.