Power availability in Elk Grove: DCPI verdict AVOID, composite score 20.9 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 234 words · generated 2026-11-12 from live DC Hub data · DCPI live as of 2026-11-12
Elk Grove has 100 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Compass Datacenters (100 MW).
| Status | MW |
|---|---|
| Under construction | 100 |
| Total listed | 100 |
| Operator | Under construction MW | Planned MW |
|---|---|---|
| Compass Datacenters | 100 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
Elk Grove operates as a seven-facility market dominated by Digital Realty's four-site footprint, with a single tracked operator reporting utilization metrics to DCPI. No recent deal activity has been recorded in the tracked dataset.
Together, these metrics suggest that new projects seeking uncommitted power will encounter significant lead times and potentially elevated costs to secure supply.
Digital Realty's concentration across four of seven tracked facilities establishes the market's dominant operator presence, while Compass Datacenters and the municipally-associated ELK GROVE VILLAGE (CHI10-11-12) DATA CENTER round out the operator base. The absence of recent tracked deals does not reflect market inactivity but rather a period without announced acquisitions, sales, or lease signings meeting DCPI's recording threshold.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Compass Elk Grove Campus (Sacramento) | Compass Datacenters | Under Construction | 100 |
| Digital Realty CH2 - Chicago | Digital Realty | Operational | |
| Digital Realty CH3 - Chicago | Digital Realty | Operational | |
| ELK GROVE VILLAGE (CHI10-11-12) DATA CENTER |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Illinois.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Elk Grove: 100 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/elk-grove/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-12, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load