Power availability in El Segundo: DCPI verdict CAUTION, composite score 48.7 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 246 words · generated 2026-11-12 from live DC Hub data · DCPI live as of 2026-11-12
El Segundo has 42 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are ServerFarm (28 MW) and Digital Realty (14 MW).
| Status | MW |
|---|---|
| Operational | 42 |
| Total listed | 42 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
The market has not recorded recent deal activity in the tracked dataset. The operator roster shows fragmentation typical of secondary West Coast markets, with no single player commanding majority capacity.
This split signals that while some power capacity exists in the region, accessing it for new development faces material headwinds. The verdict does not forecast scarcity that bars entry, but rather flags that power secured through standard channels may encounter delays or capacity limitations.
Across neighboring markets, consolidation continues—Digital Realty's 600 MW Kansas campus development and related M&A activity underscores ongoing greenfield and acquisition strategies among regional players—yet El Segundo's own deal flow remains flat. The operator mix (Digital Realty at 3 sites, Equinix at 2, and smaller ServerFarm presence) shows neither dominant concentration nor clear exit signals; market composition simply has not shifted in the recent tracked period.
| Facility | Operator | Status | MW |
|---|---|---|---|
| ServerFarm Los Angeles | ServerFarm | Operational | 28 |
| DRT LAX12 | Digital Realty | Operational | 14 |
| Digital Realty LAX (2260 E El Segundo) | Digital Realty | Operational | |
| Digital Realty LAX39 El Segundo | Digital Realty | Operational | |
| Equinix LA2 El Segundo | Equinix | Operational | |
| Equinix LA3/LA4 - Los Angeles, El Segundo | Equinix | Operational | |
| Serverfarm LAX1 Los Angeles | Serverfarm | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in California.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
El Segundo: 42 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/el-segundo/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-12, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load