Power availability in El Paso: DCPI verdict BUILD, composite score 67.4 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 228 words · generated 2026-11-11 from live DC Hub data · DCPI live as of 2026-11-12
El Paso has 77 MW under construction and 75 MW planned among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Meta (152 MW).
| Status | MW |
|---|---|
| Under construction | 77 |
| Planned | 75 |
| Total listed | 152 |
| Operator | Under construction MW | Planned MW |
|---|---|---|
| Meta | 77 | 75 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
Meta operates the largest presence with nine facilities combined across its corporate and platform divisions, followed by Transtelco El Paso with five sites. Centurylink maintains a three-site regional footprint split between El Paso and Santa Teresa. The market remains highly concentrated among these three operators.
This combination favors developers seeking to add infrastructure without facing immediate power scarcity or severe interconnection delays.
Deal activity centers on Meta's strategic positioning in the region. Meta announced a $12.5 billion acquisition, anchoring a major capital commitment to El Paso infrastructure. These transactions reflect sustained operator confidence in the market's power availability and transmission access. No recent acquisitions or sales by competing operators appear in tracked deal flow, suggesting consolidation remains limited to Meta's expansion.
Forward momentum depends on whether new power supply commitments—particularly utility-level generation or transmission upgrades—materialize to support the announced $14–15 billion development pipeline.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Meta El Paso Building 1 | Meta | Under Construction | 75 |
| Meta El Paso Building 2 | Meta | Planned | 75 |
| Meta El Paso Data Center | Meta | Under Construction | 2 |
| MDC El Paso | MDC Data Centers | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Texas.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
El Paso: 2,670 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/el-paso/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-11, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load