Power availability in Eagle Mountain: DCPI verdict CAUTION, composite score 47.9 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 165 words · generated 2026-11-08 from live DC Hub data · DCPI live as of 2026-11-12
Eagle Mountain has 350 MW under construction and 250 MW planned among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are QTS (300 MW), Google (200 MW) and Meta (100 MW).
| Status | MW |
|---|---|
| Under construction | 350 |
| Planned | 250 |
| Total listed | 600 |
| Operator | Under construction MW | Planned MW |
|---|---|---|
| QTS | 300 | |
| 200 | ||
| Meta | 50 | 50 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
The CAUTION verdict reflects a mixed backdrop for new power procurement. Projects seeking incremental power will face extended timelines for feasibility studies and interconnection queue positions rather than immediate availability.
Meta's continued expansion announcements indicate operator-led capacity growth rather than third-party acquisition activity. The six Meta-operated facilities represent the dominant footprint, while QTS and Google each hold single sites.
| Facility | Operator | Status | MW |
|---|---|---|---|
| QTS Eagle Mountain Campus | QTS | Under Construction | 300 |
| Google Eagle Mountain Data Center | Planned | 200 | |
| Meta Eagle Mountain Building 1 | Meta | Under Construction | 50 |
| Meta Eagle Mountain Building 2 | Meta | Planned | 50 |
| Meta Eagle Mountain Data Center | Meta | Operational | |
| Meta Eagle Mountain Utah | Meta | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Utah.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Eagle Mountain: 700 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/eagle-mountain/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-08, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load