Des Moines data center market

Power availability in Des Moines: DCPI verdict AVOID, composite score 31.6 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 266 words · generated 2026-11-08 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score31.6/100
MW, all listings823sum of the sites that report MW; most do notany status, unverified listings included
VerdictAVOID

Des Moines at a glance

Des Moines has 815 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Meta (500 MW), Microsoft (300 MW) and Involta (15 MW).

Capacity by status, as of 2026-11-12
StatusMW
Operational815
Total listed815

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Des Moines

DC Hub does not hold a lease-rate figure for this market yet.

The market is dominated by hyperscale and regional colocation operators, reflecting established competitive positioning. The presence of multiple top-tier operators signals sustained infrastructure investment in the region, though facility distribution remains concentrated among three players.

Together, these scores indicate that operators seeking to expand or deploy new capacity in Des Moines will encounter friction in securing additional power allocations, making the market unattractive for power-dependent growth strategies.

No recent deals are tracked in Des Moines' transaction registry, leaving current operator M&A activity and capacity expansion intentions opaque. Microsoft's publicly announced plans for regional facility development create localized infrastructure signals, yet this has not translated into tracked deal activity in Des Moines proper. Cologix's three-site footprint and Meta's seven-site presence establish established operational scale, but no visible consolidation, divestiture, or expansion transactions are documented at this time.

Data centers in Des Moines

FacilityOperatorStatusMW
Microsoft Des Moines Data CenterMicrosoftOperational300
Facebook Altoona Data Center 1MetaOperational100
Facebook Altoona Data Center 2MetaOperational100
Facebook Altoona Data Center 3MetaOperational100
Facebook Altoona Data Center 4MetaOperational100
Facebook Altoona Data Center 5MetaOperational100
Involta Des MoinesInvoltaOperational15
Altoona Meta Data CenterMetaOperational
AureonOperational
Aureon DowntownAureon Network ServicesOperational
Azure Central US IowaMicrosoftOperational
Cologix DES1 Des MoinesCologixOperational
Cologix DSM1Cologix, Inc.Operational
Lightedge Des Moines 2Operational
MetaOperational
Project OsmiumMicrosoftOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Iowa.

More on Des Moines

Email me when the Des Moines DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Des Moines: 823 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/des-moines/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-08, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load