Power availability in Denver: DCPI verdict CAUTION, composite score 52.1 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 231 words · generated 2026-11-10 from live DC Hub data · DCPI live as of 2026-11-12
Denver has 237 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Vantage Data Centers (60 MW), Equinix (40 MW) and Stream Data Centers (30 MW).
| Status | MW |
|---|---|
| Operational | 237 |
| Total listed | 237 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: CBRE North America Data Center Trends H1 2026 (250+ kW): Denver (figure on paid plans) (link)
The market has seen developer activity tied to Aurora-area expansion, and municipal engagement on data center policy remains active through Denver's advisory group structure and ongoing regulatory discussions.
This gap means that securing new capacity will depend heavily on point-of-delivery infrastructure readiness and interconnection queue position rather than raw generation scarcity. Developers and operators pursuing new or expanded projects must account for lead times in network upgrades and potential congestion in fiber routes serving key industrial corridors.
Flexential's dominant site count suggests established depth in the market, while DataBank and CoreSite each maintain smaller but meaningful footholds. The absence of announced acquisition, investment, or build activity in the tracked period offers no signal about future operator movement or consolidation appetite; deal flow silence does not indicate market weakness or retreat.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Vantage Denver | Vantage Data Centers | Operational | 60 |
| Equinix DE Campus | Equinix | Operational | 40 |
| Stream Denver | Stream Data Centers | Operational | 30 |
| EdgeConneX Denver | EdgeConneX | Operational | 25 |
| Lincoln Rackhouse DEN1 | Lincoln Rackhouse | Operational | 25 |
| T5@Denver | T5 | Operational | 18 |
| Flexential Denver 2 | Flexential | Operational | 12 |
| Flexential Denver 1 | Flexential | Operational | 10 |
| Evoque Denver 1 | Evoque | Operational | 9 |
| DataBank DEN2 | DataBank | Operational | 8 |
| 1500 Champa | IPI Partners, LLC | Operational | |
| CoreSite - Denver (DE1) | CoreSite | Operational | |
| CoreSite - Denver (DE2) | CoreSite | Operational | |
| CyrusOne Aurora I | CyrusOne Inc. | Operational | |
| DataBank DEN1 Denver | DataBank | Operational | |
| DataBank Denver (DEN3) | DataBank | Operational | |
| DataBridge Sites Aurora | DataBridge Sites | Operational | |
| Digital Realty DEN1 Denver | Digital Realty | Operational | |
| EdgeConneX Denver CO | EdgeConneX | Operational | |
| Equinix DE2 - Denver | Equinix | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Colorado.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Denver: 471 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/denver/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-10, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load