Chicago data center market

Power availability in Chicago: DCPI verdict AVOID, composite score 21.9 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 251 words · generated 2026-11-09 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score21.9/100
MW, all listings1,383sum of the sites that report MW; most do notany status, unverified listings included
VerdictAVOID

Chicago at a glance

Chicago has 821 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are CoreWeave (150 MW), Stack Infrastructure (120 MW) and Digital Realty (102 MW).

Capacity by status, as of 2026-11-12
StatusMW
Operational821
Total listed821

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Chicago

Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: CBRE North America Data Center Trends H1 2026 (250+ kW): Chicago (figure on paid plans) (link)

Regulatory attention is mounting, with Illinois state leadership and local municipalities actively shaping development policy around future capacity expansion.

This verdict reflects the current state of power and supply dynamics—not market desirability or operator demand—but it does signal that siting or expanding capacity here will require direct engagement with utility infrastructure, interconnection queues, and potentially off-site power solutions.

Recent M&A activity shows selective institutional movement. Smaller operators and regional players appear less active in recent registry tracking, while hyperscaler investment patterns (visible in suburban land purchases noted in local reporting) suggest forward positioning ahead of clearer power-access pathways.

Data centers in Chicago

FacilityOperatorStatusMW
CoreWeave Chicago CampusCoreWeaveOperational150
Equinix CH CampusEquinixOperational80
Stack ChicagoStack InfrastructureOperational80
Digital Realty CHI CampusDigital RealtyOperational60
Prime Chicago 1Prime Data CentersOperational50
Switch ChicagoSwitchOperational50
CloudHQ ChicagoCloudHQOperational48
STACK Chicago CHI01Stack InfrastructureOperational40
Stream Chicago 1Stream Data CentersOperational40
ServerFarm ChicagoServerFarmOperational35
CME Group Data CenterCME GroupOperational30
Aligned ChicagoAlignedOperational28
Netrality 1 South WackerNetralityOperational18
Stream ChicagoStreamOperational18
Element Critical ChicagoElement CriticalOperational15
Digital Realty CH1Digital RealtyOperational14
Digital Realty CH2Digital RealtyOperational14
Digital Realty CH3Digital RealtyOperational14
US Signal ChicagoUS SignalOperational12
TierPoint ChicagoTierPointOperational10

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Illinois.

More on Chicago

Email me when the Chicago DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Chicago: 1,383 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/chicago/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-09, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load