Power availability in Cheyenne: DCPI verdict BUILD, composite score 74.8 of 100, as of 2026-11-12. Source: DC Hub.
Data Center Market Deep-Dive · 263 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12
Cheyenne has 340 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Crusoe Energy (1,800 MW), Microsoft (300 MW) and Novva Data Centers (40 MW).
| Status | MW |
|---|---|
| Operational | 340 |
| Status not reported | 1,800 |
| Total listed | 2,140 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
Microsoft operates the largest footprint with 6 sites, while University Corporation for Atmospheric Research and Advanced Communications Technology each maintain secondary presences. The market remains fragmented, with no single operator controlling the majority of tracked capacity.
This posture supports greenfield projects and expansions that require dedicated generation or firm offtake agreements.
The campus is planned to run on fuel cells and gas generation paired with carbon capture and storage, indicating that developers are structuring projects around local generation rather than relying solely on grid supply. Separately, Google and an unnamed partner formed a joint venture valued at $4 billion focused on data center development. Municipal activity underscores supply-side preparation: Cheyenne City Council has approved annexation of Orchard Hills for potential data center use, and power-generating facility amendments are advancing through planning review. These zoning and utility actions reflect coordination between local authority and developer timelines around generation and land readiness.
The convergence of announced megaproject capital, spare power capacity, and municipal infrastructure planning positions Cheyenne as an active build corridor over the next 24–36 months.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Crusoe/Tallgrass AI Data Center Campus | Crusoe Energy | Announced | 1,800 |
| Microsoft Cheyenne Data Center | Microsoft | Operational | 300 |
| Novva Cheyenne | Novva Data Centers | Operational | 40 |
| Azure West Central US Wyoming | Microsoft | Operational | |
| CYS41 Datacenter | Microsoft | Operational | |
| Cogent Cheyenne | Cogent Communications, Inc. | Operational | |
| Meta Cheyenne Data Center | Meta | Operational | |
| Microsoft CYS Datacenter | Microsoft | Operational | |
| Microsoft Cheyenne WY | Microsoft | Operational | |
| Mountain West Technologies - Cheyenne | Mountain West Technologies Corporation | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Wyoming.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Cheyenne: 2,140 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/cheyenne/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load