Chattanooga data center market

Power availability in Chattanooga: DCPI verdict AVOID, composite score 29.5 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 227 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

DCPI Score29.5/100
MW, all listings12sum of the sites that report MW; most do notany status, unverified listings included
VerdictAVOID

Chattanooga at a glance

Chattanooga has 12 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are DC BLOX (12 MW).

Capacity by status, as of 2026-11-12
StatusMW
Operational12
Total listed12

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Chattanooga

DC Hub does not hold a lease-rate figure for this market yet.

Chattanooga's tracked data center footprint spans five facilities across a operator base including DC BLOX, Google, and Peace Communications. One tracked site reports power consumption data, though market-wide capacity figures remain undisclosed. Recent deal activity in this market has not been tracked.

These scores suggest that power procurement will require either significant capital investment in local infrastructure or substantial delays in project timelines.

Operator concentration remains moderate, with no single entity dominating the five tracked sites. DC BLOX holds two facilities (direct entity and parent company listed separately), Google holds two (similarly listed), and Peace Communications holds one. The absence of recent tracked deals does not characterize market momentum; rather, it reflects the current state of recorded transaction activity. Broader regional interest in data center development is evident from proposed large-scale projects, though these remain subject to local permitting and community debate.

Data centers in Chattanooga

FacilityOperatorStatusMW
DC BLOX ChattanoogaDC BLOXOperational12
Google Jackson County Data CenterGoogleOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Tennessee.

More on Chattanooga

Email me when the Chattanooga DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Chattanooga: 12 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/chattanooga/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load